My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
2900 - Site Mitigation Program
>
PR0542398
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2026 8:49:30 AM
Creation date
2/17/2026 12:07:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542398
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024360
FACILITY_NAME
JAMAR SERVICE STATION
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
1572611
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
4075 E MAIN ST STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GAVIN NEwcon <br /> �_i•, „J GOVERNOR <br /> CALIFORRIA JAM)BLUMENFELD <br /> W SECRETARY FOR <br /> Water Boards <br /> ENVIRONMENTAL PROTECTION <br /> Central Valley Regional Water Quality Control Board <br /> 17 August 2021 <br /> Lori Toccoli <br /> Mcllrath Family LTD PTP <br /> P.O. Box 326 <br /> Stockton, CA 95201 <br /> RESPONSE TO WELL DESTRUCTION WORK PLAN, JAMAR SERVICE, 4075 EAST <br /> MAIN STREET, STOCKTON, SAN JOAQUIN COUNTY, LUST CASE #391042, <br /> GEOTRACKER GLOBAL ID #T0607700858 <br /> Central Valley Regional Water Quality Control Board (Central Valley Water Board) staff <br /> reviewed the Monitoring Well Destruction Work Plan (Work Plan). This document was <br /> submitted by ATC Group Services Inc. (ATC) on your behalf for the Jamar Service <br /> underground storage tank (UST) petroleum release case at 4075 East Main Street in <br /> Stockton (Site). In the Work Plan, ATC proposes to destroy all 38 remaining Site wells <br /> as follows: <br /> Table 1 — Summary of Proposed Well Destructions <br /> Total Depth <br /> No. of Destruction <br /> Well Type Wells Wells ft b Range Method <br /> Pressure Grout <br /> MW-9A/B/C, MW-13A/B/C, & remove top 3 <br /> MW-14B/C 8 75-110 feet of casing <br /> Ground-water and annual seal <br /> Monitoring MW-1/1C, MW-2, MW-3/3C, <br /> MW-4, MW-5, MW-6A/B/C, <br /> MW-7A/B/C, MW-8, 20 70-110 <br /> MW-10A/B/C, MW-11 C, Over-drill with <br /> MW-12A, EW-1 Hollow Stem <br /> Injection IW-1 thru IW-5 5 110-110.5 Auger to Total <br /> dual completion) Depth <br /> Injection IW-6, IW-7 2 75-77.5 <br /> (single completion) <br /> Vapor Extraction VEW-1 thru VEW-3 3 50-51 <br /> ft bgs= feet below ground surface <br /> KARL E. LONGLEY SCD, P.E., CHAIR I PATRICK PULUPA, ESQ., EXECUTIVE OFFICER <br /> 11020 Sun Center Drive#200, Rancho Cordova, CA 95670 1 www.waterboards.ca.gov/centralvalley <br />
The URL can be used to link to this page
Your browser does not support the video tag.