Laserfiche WebLink
January 17,2023 <br /> Rania Zabaneh <br /> Page 4 of 4 <br /> Reference:Transmittal of Supplemental Site Investigation Work Plan and Response to Comments-South Pointe <br /> Property-701, 705,833,&855 West Weber Avenue,Stockton,California <br /> immediately below the soil pile/fill or soil pile/native boundary. According to Tables 1 and 2, <br /> particular proposed boring locations where this would cause a change in depths of samples for <br /> PCB analysis appear to include 6, 11, 24, 26, 29, and 31, but all proposed locations should be <br /> reviewed for this concern. <br /> Stantec response: The sampling matrix has been adjusted so that samples to be analyzed for PCBs <br /> are collected from surface or near-surface locations in native materials, including native materials <br /> located beneath the overlying soil pile (where applicable). <br /> Closing <br /> Please contact the undersigned if you have any questions or comments regarding this Work Plan. <br /> Regards, <br /> STANTEC CONSULTING SERVICES INC. <br /> Neil Doran PG Nicole Longinotti PG <br /> Principal Geologist Associate Geologist <br /> Mobile: (510) 919-0059 Mobile: (510) 220-7100 <br /> neil.doran@stantec.com nicole.longinotti@stantec.com <br /> Attachment: Supplemental Site Investigation Work Plan (Stantec,2023) <br /> cc:Jordan Peterson, City of Stockton <br /> Design with community in mind <br />