My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JTD 12/4/2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
COMPLIANCE INFO_JTD 12/4/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2026 11:18:02 AM
Creation date
2/19/2026 8:47:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
JTD 12/4/2025
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1459
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Foothill Sanitary Landfill Page 18 of 52 San Joaquin County DPW - Solid Waste <br />Joint Technical Document Revised 12/04/2025 <br /> <br />Initial sizing, placement, and orientation of the landfill was done within the constraints <br />offered by the physical settings. Drainage design was influenced by the surrounding surface <br />watershed and drainage flow-paths. Module depth below the ground surface was influenced by <br />the depth to groundwater and soil conditions. <br /> <br />5.3.2.3. Liners on Native Soil <br />Future modules will be constructed with a soil operations layer, geotextile, drainage <br />layer, LCRS systems, geomembrane, GCL, and prepared subgrade. Liners will be installed to <br />cover all natural geologic materials where refuse will be placed. <br /> <br />5.3.2.4. Precipitation and Drainage Control <br />The modules will be designed and constructed to limit ponding, infiltration, inundation, <br />erosion, slope failure, washout, and overtopping. <br /> <br />Diversion and drainage facilities will be designed, constructed, and maintained to <br />accommodate the anticipated volume of precipitation and peak flows from surface runoff, <br />prevent surface erosion, control and intercept run-on, and take into account planned final <br />designs, in accordance with applicable regulations. <br /> <br />5.3.3. Climatological Factors <br />The leachate collection and recovery system is designed to remove twice the anticipated <br />leachate production. Rainfall data is used as the basis for sizing drainage facilities and ET <br />closure caps. <br /> <br />5.3.4. Seismic Design <br />The seismicity characterization provided in the 2015 JTD referenced a 2002 <br />EMCON/OWT study. Because of new data in the earthquake catalogue, recent guidance <br />documents, and new attenuation relationships, the 2002 EMCON/OWT analysis have been <br />updated in the JTD Addendum (2012). <br /> <br />The Foothill Sanitary Landfill is a Class III waste site, and as such Title 27 CCR requires <br />that the waste containment units be designed to withstand at least the maximum probable
The URL can be used to link to this page
Your browser does not support the video tag.