Laserfiche WebLink
Environmental Health Department <br />Corrective Action Statement <br />RE: October 08, 2025, inspection report <br />For each violation listed below, indicate if the violation has been corrected or will be corrected by a certain date. Also, <br />describe what was done to correct the violation in the space provided below each violation. Submit this completed form <br />with the Return to Compliance Certification within 30 days of inspection. If you have any questions, please contact <br />Kristina Saetern at (209) 616-3045 or ksaetern@sjgov.org. <br />G & F AG SERVICE, 21399 CARROLTON RD, CERS ID: 10185583, PR0529268 <br />Violation #48 - 4030010 - Adequately sized secondary containment provided and maintained for bulk storage <br />containers. <br />¨ This violation was corrected ¨ This violation will be corrected by (date): <br />¨ Supporting documents included <br />Describe actions taken or will be taken to correct violation: <br />Violation #50 - 4030013 - Containment systems are sufficiently impervious to contain oil. <br />¨ This violation was corrected ¨ This violation will be corrected by (date): <br />¨ Supporting documents included <br />Describe actions taken or will be taken to correct violation: <br />Violation #55 - 4030014 - Tanks inspected and tested by qualified person in accordance with industry <br />standards. <br />¨ This violation was corrected ¨ This violation will be corrected by (date): <br />¨ Supporting documents included <br />Describe actions taken or will be taken to correct violation: <br />Page 3 of 5 <br />Rev. 9/16/2020 <br />1868 E. Hazelton Avenue | Stockton, California 95205 | T 209 468-3420 | F 209 464-0138 | www.sjgov.org/EHD <br />x 1/1/2026 <br />We have ordered parts needed to utilize coupler valves <br />per the recommendation of our fuel supplier. This will allow us to use the pump we have without having the <br />tanks manifolded together. <br />x 1/1/2026 <br />Containment was inspected and I believe it was <br />determined to be impervious to liquid. Waiting on final report from inspector. <br />x <br />Certified tank inspector inspected the tanks on <br />Nov 10, 2025. <br />Parts have arrived. Installation scheduled for the end of the week. <br />2/20/26 <br />Still waiting on final report from inspector. <br />3/1/26