Laserfiche WebLink
Environmental Health Department <br />Corrective Action Statement <br />RE: October 08, 2025, inspection report <br />For each violation listed below, indicate if the violation has been corrected or will be corrected by a certain date. Also, <br />describe what was done to correct the violation in the space provided below each violation. Submit this completed form <br />with the Return to Compliance Certification within 30 days of inspection. If you have any questions, please contact <br />Kristina Saetern at (209) 616-3045 or ksaetern@sjgov.org. <br />G & F AG SERVICE, 21399 CARROLTON RD, CERS ID: 10185583, PR0529268 <br />Violation #64 - 4030020 - Adequate secondary containment provided for mobile/portable storage containers. <br />¨ This violation was corrected ¨ This violation will be corrected by (date): <br />¨ Supporting documents included <br />Describe actions taken or will be taken to correct violation: <br />Violation #67 - 4030028 - Terminal connection capped/blank flanged at transfer point & origin marked if not <br />in service/standby. <br />¨ This violation was corrected ¨ This violation will be corrected by (date): <br />¨ Supporting documents included <br />Describe actions taken or will be taken to correct violation: <br />Violation #83 - 4030 - Operations/Maintenance - General. <br />¨ This violation was corrected ¨ This violation will be corrected by (date): <br />¨ Supporting documents included <br />Describe actions taken or will be taken to correct violation: <br />Page 5 of 5 <br />Rev. 9/16/2020 <br />1868 E. Hazelton Avenue | Stockton, California 95205 | T 209 468-3420 | F 209 464-0138 | www.sjgov.org/EHD <br />x 1/15/2026 <br />Diesel trailers are now being stored empty and <br />on concrete with spill kit as those meet the definition of mobile refuelers. The only trailer containing <br />bulk oil is T1. We are in the process of ordering and installing secondary containment within that trailer. <br />x <br />Tank 2 and 6 have new caps installed at transfer <br />point. <br />x 1/15/2026 <br />Certified tank inspector and fuel supplier both <br />advised they are not UST's. Waiting on final report from the tank inspector. <br />x <br />Additional parts are on order for secondary containment within T1. Installation scheduled for laterthis week. <br />2/20/26 <br />Still waiting on final report from inspector. <br />3/1/26