My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
6505
>
2800 - Aboveground Petroleum Storage Program
>
PR2600015
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2026 9:33:19 AM
Creation date
2/20/2026 9:32:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR2600015
PE
2832 - AST FAC 10 K - </=100 K GAL CUMULATIVE
FACILITY_ID
FA0000764
FACILITY_NAME
RICHARD A PITTMAN VA CLINIC
STREET_NUMBER
6505
Direction
S
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
6505 S MANTHEY RD FRENCH CAMP 95231
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Health Department <br />Aboveground Petroleum Storage Act Program Inspection Report <br />Facility Name:Facility Phone:Date: <br />RICHARD A PITTMAN VA CLINIC (XXX) XXX-XXXX February 13, 2026 <br />CERS ID:Facility Address: <br />6505 S MANTHEY RD, FRENCH CAMP, CA 95231 10982086 <br />Phone: <br />(925) 434-2505 <br />Title: <br />Environmental Contact <br />Inspection Contact: <br />Suman Sharma <br />Inspection Type: <br />Routine <br />Program: <br />2832 - AST FAC 10 K - </=100 K GAL CUMULATIVE <br />Consent Given By: <br />Suman Sharma, Environmental Contact <br />Consent For: <br /> Inspection Photos Samples <br />CCR = California Code of Regulations HSC = Health and Safety Code CFR = Code of Federal Regulations EHD = Environmental Health Department <br />OUT = Violation R = Repeat Violation COS = Corrected on site during inspection <br />1 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.3, 112.6 <br />4010001-SPCC has been prepared OUT R COS <br />2 40 CFR 1 112.3, 112.6; <br />HSC 6.67 25270.4.5(a); <br />19 CCR 11 1601, 1611(a) <br />(2) <br />4010057-SPCC plan has been prepared that meets all applicable requirements OUT R COS <br />3 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.3 <br />4030038-SPCC has been implemented OUT R COS <br />4 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.3(e)(1) <br />4010008-SPCC onsite If facility staffed 4 hrs/day, or at the nearest field office if <br />not so attended <br /> OUT R COS <br />5 19 CCR 11 1601, 1613(a)4010059-SPCC Plan and all required records/documentation available for review <br />during normal working hours <br /> OUT R COS <br />6 40 CFR 1 112.3(d); HSC <br />6.67 25270.4.5(a); 19 <br />CCR 11 1601, 1611(a)(3) <br />4010003-Professional engineer has properly reviewed and certified the SPCC <br />Plan <br /> OUT R COS <br />7 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.3(d)(1) <br />4010045-A professional engineer made all required attestations in the SPCC Plan OUT R COS <br />8 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.5(a), 112.5 <br />(b) <br />4010010-Facility has amended SPCC as necessary OUT R COS <br />9 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.5(a), 112.5 <br />(b) <br />4030039-SPCC has been implemented within 6 months of amendment OUT R COS <br />10 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.5(c) <br />4010039-Technical amendment(s) were certified by a licensed professional <br />engineer <br /> OUT R COS <br />11 40 CFR 1 112.5 (b); HSC <br />6.67 25270.4.5 (a); 19 <br />CCR 11 1601, 1611(a)(4) <br />4010009-5 year review performed on SPCC and documented OUT R COS <br />12 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.7 <br />4010012-SPCC in writing, follows code seq/cross ref, good eng practice, mgt <br />approval, items not in place <br /> OUT R COS <br />13 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.7(a)(1), <br />112.7(j) <br />4010013-SPCC Plan discusses conformance with all SPCC rule requirements, & <br />state rules/regs/guidelines. <br /> OUT R COS <br />14 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.7(a)(2) <br />4010014-Environmental Equivalence, if claimed, is addressed in SPCC, other <br />than for secondary containment. <br /> OUT R COS <br />15 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.7(a)(3) <br />4010016-Physical layout of the facility is adequately and accurately described in <br />SPCC <br /> OUT R COS <br />16 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.7(a)(3)(i) <br />4010041-SPCC Plan addresses the type of oil and storage capacity for all fixed <br />and portable containers <br /> OUT R COS <br />17 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.7(a)(3) <br />4010015-SPCC contains an adequate facility diagram OUT R COS <br />1868 E. Hazelton Avenue | Stockton, California 95205 | T 209 468-3420 | F 209 464-0138 | www.sjgov.org/EHD <br />Page 1 of 6EHD - CUPA Inspection Report IS03 <br />CP25 - AST Non-Qualified <br />2/13/2026FA0000764 PR2600015 4612414
The URL can be used to link to this page
Your browser does not support the video tag.