My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
6505
>
2800 - Aboveground Petroleum Storage Program
>
PR2600015
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2026 9:33:19 AM
Creation date
2/20/2026 9:32:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR2600015
PE
2832 - AST FAC 10 K - </=100 K GAL CUMULATIVE
FACILITY_ID
FA0000764
FACILITY_NAME
RICHARD A PITTMAN VA CLINIC
STREET_NUMBER
6505
Direction
S
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
6505 S MANTHEY RD FRENCH CAMP 95231
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aboveground Petroleum Storage Act Program Inspection Report <br />Date: <br />February 13, 2026 <br />Facility Address: <br />6505 S MANTHEY RD, FRENCH CAMPRICHARD A PITTMAN VA CLINIC <br />Facility Name: <br />Environmental Health Department <br />18 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.7(a)(3)(ii) <br />4010030-SPCC adequately addresses discharge prevention measures for routine <br />handling, loading/unloading <br /> OUT R COS <br />19 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.7(a)(3)(iv) <br />4010042-SPCC Plan addressed countermeasures for discharge discovery, <br />response and cleanup <br /> OUT R COS <br />20 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.7(a)(3)(v) <br />4010043-SPCC Plan addresses disposal methods for recovered materials OUT R COS <br />21 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.7(a)(3)(vi); <br />112.7(a)(4) <br />4010017-SPCC contains procedures for reporting a discharge OUT R COS <br />22 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.7(a)(5) <br />4010018-SPCC organized so discharge procedures are readily usable if the <br />facility has no response plan <br /> OUT R COS <br />23 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.7(b) <br />4010019-SPCC predicts direction, rate of flow, total quantity of oil that could be <br />released from a discharge <br /> OUT R COS <br />24 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.7(a)(1), <br />112.7(c) <br />4010020-SPCC addresses the appropriate general containment/diversionary <br />structures/equipment <br /> OUT R COS <br />25 40 CFR 1 112.7(c); HSC <br />6.67 25270.4.5(a); 19 <br />CCR 11 1601, 1611(a)(5) <br />4030037-Appropriate (general) containment/diversionary structures/equipment <br />have been provided <br /> OUT R COS <br />26 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.7(d) <br />4010004-Impracticability of containment/diversionary items, if claimed, is PE <br />demonstrated and certified <br /> OUT R COS <br />27 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.7(d) <br />4030033-Periodic integrity/leak testing performed with impracticability claim OUT R COS <br />28 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.7(d)(1) <br />4010005-If claiming impracticability of containment/diversionary items a <br />contingency plan has been included <br /> OUT R COS <br />29 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.7(d)(2) <br />4010006-If claiming impracticability written commitment of manpower, equipment, <br />and materials provided <br /> OUT R COS <br />30 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.7(f)(1), <br />112.7(f)(3) <br />4010023-Employee training and spill prevention briefings discussed in SPCC plan OUT R COS <br />31 40 CFR 1 112.7(f)(1); <br />HSC 6.67 25270.4.5(a); <br />19 CCR 11 1601, 1611(a) <br />(7) <br />4020001-Training provided to all oil-handling personnel and records maintained <br />for 3 years <br /> OUT R COS <br />32 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.7(a)(1), <br />112.7(f)(2) <br />4010022-Person has been designated as accountable for discharge prevention <br />and reports to management <br /> OUT R COS <br />33 40 CFR 1 112.7(f)(3); <br />HSC 6.67 25270.4.5(a); <br />19 CCR 11 1601, 1611(a) <br />(7) <br />4020002-Spill prevention briefings are conducted annually and records <br />maintained for 3 years <br /> OUT R COS <br />34 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.7(g) <br />4010024-SPCC addresses security measures-lighting, access to <br />handling/storage, valves/pumps/transfer equip <br /> OUT R COS <br />35 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.7(g) <br />4030001-Handling areas, valves, pumps/starter controls, load/unload connections <br />secured, lighting adequate <br /> OUT R COS <br />36 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.7(a)(1), <br />112.7(h) <br />4010025-SPCC adequately discusses facility tank car and tank truck <br />loading/unloading rack <br /> OUT R COS <br />37 40 CFR 1 112.7(h)(1); <br />HSC 6.67 25270.4.5(a); <br />19 CCR 11 1601, 1611(a) <br />(5) <br />4030002-Loading rack containment has capacity to contain single largest <br />compartment of tank car/truck <br /> OUT R COS <br />38 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.7(h)(2) <br />4030003-Vehicular departure warning system in place at facility with a <br />loading/unloading rack <br /> OUT R COS <br />39 HSC 6.67 25270.4.5(a); <br />40 CFR 1 112.7(i) <br />4010040-Documented evaluation of field-constructed tanks for risk of discharge <br />due to brittle fracture <br /> OUT R COS <br />1868 E. Hazelton Avenue | Stockton, California 95205 | T 209 468-3420 | F 209 464-0138 | www.sjgov.org/EHD <br />Page 2 of 6EHD - CUPA Inspection Report IS03 <br />CP25 - AST Non-Qualified <br />2/13/2026FA0000764 PR2600015 4612414
The URL can be used to link to this page
Your browser does not support the video tag.