Laserfiche WebLink
Underground Storage Tank <br /> Release Detection Equipment Testing Report Form <br /> 16. SENSOR TEST RESULTS I <br /> List only sensors tested. List "Sensor ID"as labeled in system programming. For VPH monitoring, <br /> continuity must be confirmed between the most distant points in the interstitial space to the extent <br /> practical as approved by the Unified Program Agency and the sensor that monitors the zone. <br /> Sensor Sensor Function Continuity <br /> ID Model Component(s) Monitored <br /> Pass Fail Pass Fail NA <br /> L1 794380-352 T1 Unleaded 91 Turbine Sump ® ❑ ❑ ❑ ❑ <br /> L2 794380-352 T2 Unleaded 87 Turbine Sump ® ❑ ❑ ❑ ❑ <br /> L3 794380-352 T3 Diesel 91 Turbine Sump ® ❑ ❑ ❑ ❑ <br /> L4 794380-302 T1 Unleaded 91 Tank Annular ® ❑ ❑ ❑ ❑ <br /> L5 794380-302 T2 Unleaded 87 Tank Annular ❑ ❑ ❑ ❑ ❑ <br /> L6 794380-302 T3 Diesel Annular ® ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> Describe all answers marked "No"or"Fail"and the proposed remedy in Section 8. <br /> List all equipment either replaced or repaired (including cleaning or adjustment) in Section 8. <br /> Page 3 of 5 <br />