My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2320
>
2300 - Underground Storage Tank Program
>
PR0231084
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2026 1:46:07 PM
Creation date
2/20/2026 11:48:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231084
PE
2361 - UST FACILITY
FACILITY_ID
FA0006447
FACILITY_NAME
PAUL OIL COMPANY INC
STREET_NUMBER
2320
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12521030
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\bmascaro
Supplemental fields
Site Address
2320 N EL DORADO ST STOCKTON 95204
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Release Detection Equipment Testing Report Form <br /> 7. LINE LEAK DETECTOR TEST RESULTS <br /> ❑ Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) <br /> ❑ Check this box if Appendix 5.2 continuation page is attached. <br /> Simulated release rate verified: (Check all that apply.) <br /> ❑ 3 GPH ❑ 0.1 GPH (Required only if LLD performs line tightness testing) Yes No NA <br /> Has the testing equipment been properly calibrated? ❑ ❑ ❑ <br /> For emergency tank systems, does the LLD create an audible and visual alarm ❑ ❑ ❑ <br /> when a release is detected? <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a ❑ ❑ ❑ <br /> release is detected? <br /> For electronic LLDs, does the pressure supply pump automatically shut off when a ❑ ❑ ❑ <br /> release is detected? <br /> For electronic LLDs, does the pressure supply pump automatically shut off if the ❑ ❑ ❑ <br /> monitoring system or LLD is disabled or disconnected? <br /> For electronic LLDs, does the pressure supply pump automatically shut off if the ❑ ❑ ❑ <br /> monitoring system or LLD malfunctions or fails a tightness test? <br /> For electronic LLDs, have all accessible wiring connections been visually ❑ ❑ ❑ <br /> inspected for kinks and breaks? <br /> Were all items on the equipment manufacturer's maintenance checklist ❑ ❑ ❑ <br /> completed? <br /> Were all LLDs confirmed operational within regulatory requirements? ❑ ❑ ❑ <br /> List only line leak detectors tested. <br /> LLD ID LLD Model Lines Monitored Pass Fail <br /> Q1 Veeder-Root PLLD Unleaded 91 Line ❑ ❑ <br /> MLLD 2 Veeder-Root PLLD Unleaded 87 Line ❑ ❑ <br /> MLLD 3 Veeder-Root PLLD Diesel Line ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> Describe all answers marked "No"or"Fail"and the proposed remedy in Section 8. <br /> List all equipment either replaced or repaired (including cleaning or adjustment) in Section 8. <br /> Page 4of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.