My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
3230
>
2900 - Site Mitigation Program
>
PR0548573
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 1:10:34 PM
Creation date
2/23/2026 1:07:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548573
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0027771
FACILITY_NAME
7-ELEVENT STORE #41256
STREET_NUMBER
3230
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95206
APN
11708017
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
3230 N WEST LN STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE-SPECIFIC HEALTH AND SAFETY PLAN FOR PHASE II ENVIRONMENTAL SITE ASSESSMENT <br /> Scope of Work <br /> July 7, 2023 <br /> SCOPE OF WORK <br /> The scope of this project is to: <br /> • Travel to/from site <br /> • Conduct a utility locate <br /> • Advance 5 soil borings and collect soil samples <br /> • Conduct air monitoring (if necessary) <br /> Therefore, this HASP was prepared for the use of Stantec personnel while performing the following tasks: <br /> 1. Drive to/from the site <br /> 2. Perform utility locate <br /> 3. Drill soil borings and collect soil samples <br /> 4. Conduct air monitoring <br /> The above-stated tasks will be conducted in a manner consistent with the methods and assumptions <br /> outlined in the work request. All work plans/scopes referenced in this HASP will be available for Stantec <br /> personnel on site. All questions about the task are outlined on the work request form filled out for each <br /> sampling event which is present with the field technician on-site. The field staff may also call the Stantec <br /> Project Manager. <br /> Stantec <br /> 2.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.