My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
713
>
2300 - Underground Storage Tank Program
>
PR0521604
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 1:54:26 PM
Creation date
2/23/2026 1:53:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0521604
PE
2371 - UST FACILITY - 1702 COMPLIANT
FACILITY_ID
FA0014678
FACILITY_NAME
NASHIR EL DORADO INC
STREET_NUMBER
713
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905214
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
713 N EL DORADO ST STOCKTON 95202
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NAU I Environmental Health Department <br />OU NTY <br />1. Site map enclosed? YES W� NO[] <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training <br />certificates for each person installing or testing any component that is repaired or replaced. Ensure a copy of <br />the "Site Health and Safety Plan" is available on the jobsite as required by Title 8. <br />3. betailed description of work to be completed. List components to be repaired or replaced and attach a <br />diagram drawn to scale showing location of repairs and/or replacements. If repairing a component, describe <br />how this will be done. (If adding piping, UDC's, or other UST equipment, or performing tank top upgrade, <br />use the UST Installation Application pages 4-8 as necessary for a timely plan review): <br />Install new drop tubes on the 87 and 91 tanks <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />5. Decontamination Procedures: <br />a. Will piping be decontaminated prior to removal? <br />b. Identify contractor performing decontamination: <br />Name <br />Address <br />4of6 <br />YES [ ] <br />Phone <br />City <br />NO[] <br />Zip <br />
The URL can be used to link to this page
Your browser does not support the video tag.