Laserfiche WebLink
Quick-N-Save #1 - 2 - 15 August 2023 <br /> • To advance one hydro-punch boring, HP2, and collect a depth discrete grab <br /> groundwater sample from approximately 80 ft bgs, approximately 200 feet south <br /> of CPT9. Frey proposed a grab groundwater sample at this location, instead of <br /> installation of a groundwater monitoring well due to overhead power lines. <br /> • To install one groundwater monitoring well, MW-17, approximately 250 feet <br /> southeast of CPT10. Frey proposes to construct MW-17 to a total depth of 80 ft <br /> bgs and screened from 70 to 80 ft bgs. <br /> If you have any questions or concerns, please contact me via phone at (916) 704-4896 <br /> or via email at vera.fscher@waterboards.ca.gov. <br /> Sincerely, <br /> n <br /> �SS19lIAC C�Q <br /> Vera Fischer, P.G. o`� ��pRick 00 <br /> Engineering Geologist <br /> M <br /> 9542 <br /> do ar <br /> Galvin Kauffman, P.G. 9542 f41�or CXl.1F����t <br /> Senior Engineering Geologist <br /> cc: Mr. Joe Frey, Frey Environmental, Inc., Newport Beach (email) <br /> Mr. Kent Tucker, Frey Environmental, Inc. (email) <br /> Connor Shingai, ECAP (email) <br /> Adrian Perez, ECAP (email) <br />