Laserfiche WebLink
1.03.3 Personal Protective Equipment(PPE) <br /> 1 .03 General Safety Requirements Minimum Personal Protective Equipment required on jobsite: <br /> I.D3.1 Construction Activities CAL/OSHAReferenwSectiom: • Hard Hats <br /> Below are several ofthe CALIOSHA reference sections for the key potential health and safety hazards • Safety Glasses with side shields <br /> associated with the scope of work for this project: • FR Clothing <br /> • CAL/OSHA Title 81541 Excavation • High Visibility Traffic Vest(Class C when required)Long !j <br /> • CA4/OSHArtle 81612.1 Power Line Safety Sturdy letherve Sts <br /> • Access Title B CCR Sections 1629(a)(3) • Sturdy leather Steel orcompositto to work boots(with fi"uppers) <br /> • Mufti-employer Title B CCR Section 336.10 • Gloves(as required&pertinent to task) <br /> • Personnel Protective Equipment Title B CCR Section 1520,1522(a)Ibj(c),2330,3381(a),3382,3995, • Hearing protection(as required at or above 85 Dip) <br /> 5096(b) • Eyewash <br /> In addition to the CAL/OSHA reference sections mentioned above,all geotechnical bon ng operations shall 1.D3.4 Reporting Injuries,Illnesses and l ncidents <br /> follow MCD safety protocols for work around boring/drilling,specifically the following referenced utility Required reporting of significant safety-related incidents/events is as follows: <br /> procedures and manuals shall be adhered to during operations: <br /> Safety—Related Event Verbal Reporting Written Report <br /> • TD-441610 Gas Transmission and Distribution Manual:Damage Prevention Volume Time Deadline Deadline <br /> • TD-4412P-D5 Excavation Procedures for Damage Prevention Death/Injury ofshe workers or public person Immediately Immediately <br /> 1.03.2 Daily Job Safety Analysis(JSA) Near-Miss Incidents 24 hours 24 hours <br /> Each day,upon entering of facilities,all construction personnel must check-in at the bull room of Turner Cut Gas Une Strike or Damage Immediately 24 hours <br /> Station.Similarly,check-out must be completed by all construction personnel prior to exiting the facility each Discovery and mitigation methods of newly <br /> day. identified Site Hazards. 24 hours 24 hours <br /> Beforethe startofeach workday(oras conditions change throughout the day),the supervisor/foreman(pawn Damage to Public or Private Property Immediately 24 hours <br /> in charge)or their designee, must conduct a JSA with the employees involved.The purpose of the JSA is to <br /> identify the hazards associated with the scope of work, determine the safety precautions that will be <br /> implemented,and the required PPE by the crew performing the work assignment.The JSA must be documented 1.03.5 Records Retention Requirements <br /> and signed by all crewmembers. Any visitors to the sight must review and understand the hazards and <br /> mitigations outlined on the JSA. Job Site si ss-0.ecords Retention Requirements there is no field office documents will be kept <br /> on-site): <br /> u <br /> available an-site): <br /> All personnel must comply with the McDonald Island District Natural Gas Storage Field/Contracted • USA Ticket(s)along w/Facility Owner(s)Feedback/Response(s)(available on-site) <br /> Compression SafetyChecklist prior to entering any site locations and start of any activities.The safety checklist . Approved-Job Site Specific Safety Plans and Addend ums(available on-site) <br /> must be completed after the appropriate safety training by station personnel is conducted. Checklist is <br /> attached to this document for reference. Job-Site Safety Analysis/Job-She Hazard Analysis Briefings-Required Daily or as Site <br /> Conditions/Tasks Change(available on-site) <br /> Visual inspection of the above grade gas mains at the station platform and at the well head flow arms . Tailboard Safety Briefings(readily available) <br /> indicating bowing due to induced pipeline Stresses.TCS resides below sea level and has peat moss present to a . Permits-City,County,Environmental(readily available) <br /> depth of 45 feet.Differential settlement ofthe below grade piping within the existing peat strata and buoyant . Weekly Safety Meeting Topics and Attendance Records(readily available) <br /> forces due to seasonal flooding may cause visible bowl ng at above ground pipelines.large drilling equipment . Safety Data Sheets(readily available) <br />