Laserfiche WebLink
2 .02 Site Management 3.0 SITE EXCAVATION PLAN (PART C) <br /> 2.02.1 Potential Negative Impacts to Customers or Businesses: <br /> 3.01 Pre-Excavation Procedures <br /> Avoidance measures shall be implemented to reduce negative impacts.Examples include; <br /> Sidewalks or Pathways,Compliance with ADA,Traffic Routes, Parking-Business&Residential, 3,01.1 Underground Service Alen(USA) <br /> Bus Stops,Sanitation Collection,Notifications to Emergency Personnel,etc. • Contact USA(811)for utility locates. <br /> • Verify operators/agencies respond to request.Arrange field meetings with operators/agencies <br /> Impacted Party Potential Impact Mitigation to clarify locates. <br /> • Track USA ticket number and expiration dates daily on JHA. <br /> PG&E Potential congestion in Workarea is to take up as little space as possible to <br /> facility due to boring minimize congestion,and allow for access around 3.01.2 PG&E Dig4n Prevention Policy <br /> location. area. Drill/auger per TD4412P-05.Utilize one additional method of locating existing utilities on top of USA.These <br /> may Include,but are not limited to the following: <br /> • Ground-Penetrating Radar(GPR)Devices <br /> • Sub-Surface Ferromagnetic Locators <br /> • Path-Finder Stick <br /> • Point Guard <br /> • Une Rider(Locator) <br /> 2.02.2 Site Support <br /> The following will be established at each jobsite(General Provisions for Construction Per CAL/OSHA): <br /> • Toilet facilities and hand washing nations. <br /> • First Aid,CPR,AED trained personnel onsite as first responder's <br /> • First Aid supplies readily available onsite <br /> • Contact Information for EMS to be readily available. <br /> • Eye rinse bottles <br />