Laserfiche WebLink
installation, one in December 2020 the other in June of 2021. Results from the first round of sampling in <br /> December 2020, were above the residential ESL, whereas results from the second round completed in June <br /> 2021 were at or below the residential ESL. <br /> DTSC has requested additional soil gas sampling along the western and southern property borders and at <br /> the residences located south of the Site; the proposed scope of work to complete the sampling is provided <br /> in Section 3. <br /> 3989.0001 S.104/HSP Site-Specific Health and Safety Plan I ROUX 18 <br />