My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3081
>
2900 - Site Mitigation Program
>
PR0541231
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2026 9:53:04 AM
Creation date
2/27/2026 9:19:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0541231
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0023619
FACILITY_NAME
FORMER QUALITY CLEANERS TRACY CORNERS SHOPPING CENTER
STREET_NUMBER
3081
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418041
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
3081 N TRACY BLVD TRACY 95376
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
549
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Scope of Work <br /> Roux will be conducting groundwater, soil vapor and indoor air sampling to address previously identified data <br /> gaps for environmental conditions at the Site. <br /> To assess the concerns regarding the uncertainty of MW-2s downgradient location to MW-1, Roux will install <br /> two temporary nested, monitoring wells at two depth intervals. Borings will be advanced to approximately <br /> seven feet below the observed groundwater table and a temporary polyvinyl chloride (PVC)well screen will <br /> be placed in the boreholes to facilitate groundwater sampling. The monitoring wells will be constructed using <br /> a hollow-stem auger rig with 6-inch diameter augers. The shallow prepack well will be constructed with a 10- <br /> foot screen interval placed between approximately 6 and 16 feet bgs and an associated riser pipe between <br /> approximately 0.5 and 6 feet bgs. The deeper prepack well will be constructed using similar methods upon <br /> encountering the water bearing zone below the shallow groundwater at approximately 10 ft bgs. <br /> Seven (7)groundwater samples will be collected from existing monitoring wells MW-1 through MW-5 as well <br /> as two temporary well locations. The monitoring wells will be developed by mechanical pumping until the <br /> turbidity of the purged water is reduced. During purging activities, water quality parameters including <br /> temperature, pH, specific conductance, turbidity, dissolved oxygen, and oxygen reduction potential (ORP) <br /> will be recorded using a YSI Multi System Probe, or equivalent. Purging will continue until water quality <br /> parameters stabilize. Purging and groundwater sample collection activities will be completed at flow rates of <br /> less than 200 milliliters per minute. <br /> A soil vapor assessment to determine data gaps in previous results. Samples will be collected from 21 <br /> existing soil gas probes (SG-14, SG-15, SG-16, SG-17, SG-18A, SG-19A, SG-14, SG-24, SG-25, SG-26, <br /> SG-27, SG-28, SG-29, SG-30, SG-31, SG-34, SG-35, SG-36, SG-37, SG-40, and SG-41) as well as the two <br /> temporary soil gas probes. <br /> Roux will advance two borings for the construction of permanent soil gas wells (SG-42 through SG-43)along <br /> the western property. Two additional soil gas probes(SG44-SG45)will be installed adjacent to the residential <br /> homes located south of the Site. Soil gas probes will be installed at a depth of 5ft bgs along boundary using <br /> a downhole rod to support the well tubing and probe in the borehole. Samples will be collected at least 48 <br /> hours after the installation of the new soil vapor probes. Roux will retain a California licensed drilling <br /> contractor to perform all subsurface drilling activities. <br /> Additionally, indoor air samples will be collected from the former Quality Cleaners Suite. Two indoor, one <br /> duplicate, and two outdoor samples will be collected over an eight-hour sampling period. <br /> If there are any changes with the scope, a revision of the HASP will be required to address any new hazards. <br /> 3989.0001 S.104/HSP Site-Specific Health and Safety Plan I ROUX 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.