Laserfiche WebLink
Well Destruction Work Plan <br /> r�Or� Circle K Store No. 8671, 8606 Thornton Rd., Stockt July 24 California2020AW <br /> On December 12 through 14, 2001, one deep soil boring (SB-1)was drilled to an approximate depth <br /> of 63 feet below ground surface (bgs) and three additional groundwater monitoring wells documented <br /> i <br /> R. The reslts of <br /> work are <br /> MW-6 andreport-7) were instaed on-site by titled Site Assessment RepMW ortEdaatted June 21 u2002.tin November 2003, SECOR <br /> SEC6installed dp wells M -8 reported inPetroleum hydrocarbons soil and g oundwa enot <br /> r samples from the new wells. Vertical and lateral delineat onrof the <br /> plume has been completed. and SVE-2)were installed onsite by <br /> ls (SVE-1 <br /> SECOR?The r0esults of this work are documented5, to soil vapor extraction (SVE) eln SECOR's report titled SVE Well Installation <br /> and SVE Pilot Test Report, dated August 31, 2005. Based on the data collected during the SVE test, <br /> SVE technoloy was deterined not to be effective at removing he site becaugse of a small rad us of influence arates. <br /> hydrocarbons from the soil beneath <br /> and low mass removal rates <br /> In November 2008, Stantec installed eight oxygen injection wells (OS-1 through OS-8) as well as <br /> peroxide bench scale test. The OS wells were drilled to a depth of 49.5 feet <br /> conducted a hydrogen p <br /> bgs utilizing <br /> (PVC) blankrcasing Awith a 2 fooand were t longrsect on of 0.020--incheslot screen. The <br /> subsurface to the site is comprised of clays, silty sand and sandy silts to the total depth explored. <br /> Groundwater was first encountered at approximately 34.5 to 40.5 feet bgs during drilling activities. <br /> Soil and groundwater samples were submitted to Prima Environmental on November 12, 2008 for <br /> hydrogen peroxide bench-scale treatability testing. No other samples were collected during these <br /> activities. cygen <br /> injection 01 <br /> initiatedStantec oxygen l <br /> gen injection August 6,2010 and ceased injections on February 10, 201 . <br /> Stantec reinitiatedox ntatus Summary Report— <br /> Results are detailed snjection events Semiannualappeared to have been effective at lowering concentrations0 <br /> April 20, 2011. oxygenj <br /> of constituents of concern in groundwater at the site. <br /> in gs <br /> feet bgs <br /> to <br /> ate the lateral extent <br /> ovember <br /> o16, ATC advanced five CPT arbons downgradient of MW7n Petrole0um hyd ocarbonsuwere detected in of <br /> amounts in groundwater samples collected from CPT-4 at 107 to 110 feet bgs and from CPT-5 at <br /> 45 to 48 feet bgs. No other analytes including MTBE were detected n any of the groundwater <br /> samples collected at any depth at any location. Results were detailed in ATC's Assessment Report, <br /> dated December21, 2016. <br /> 3.0 PROPOSED SCOPE OF WORK <br /> The scope of work includes properly destroying monitoring wells MW-1, through MW-10; oxygen <br /> s shown on Figure 2. <br /> The w wells will <br /> be through d by overdrilling and soil for hells SVE-1 and SVE-2 to al depth of he original borehole. Well <br /> The wells will be destroyed by <br /> construction details are presented on Table 1. <br /> 2 <br />