Laserfiche WebLink
Well Destruction Work Plan <br /> I AJVC Circle K Store No. 8671, 8606 Thornton Rd., StocktJulyCalifornia4 020- <br /> 3.1 Site Health and Safety Plan <br /> As required by the Occupational Safety and Health Administration (OSHA) Standard "Hazardous <br /> Waste Operations and Emergency Response" guidelines (29 CFR 1910.120), and by California <br /> ation (Cal-OSHA) "Hazardous Waste Operations and <br /> Occupational Safety and Health Administr prepare a <br /> Emergency Response" guidelines ((C�Rthiticommencement o) l <br /> ffieldwo fieldwork. The Site-Specific HASP <br /> Health and Safety Plan (HASP) prior <br /> o <br /> will be reviewed and signed by all field staff and contractors before beginning field operations at the <br /> site. <br /> 3,2 Planning and Permits uin County Environmental Health Department <br /> permit from San Joaq <br /> pATC;rior o'llinitiating helf field work. Additionally, for wells in the street or sidewalk, a City of Stockton <br /> encroachment permit will be secured. Grouting activities will be performed under the direction and/or <br /> supervision of an appointed representative of the SJCEHD. <br /> 3.3 Underground Utility Locating and Clearance <br /> th the <br /> In advance d field activities, ATC) guide)gark uhe idelines and locations <br /> notifytUSA of existing <br /> upcoming subsurfaceaccordance <br /> activities. <br /> Underground Service Alert i (USA) g <br /> ATC will also contract a private utility locator to confirm the locations of underground utilities in the <br /> vicinity of each well.sr to completion, <br /> air knife vacuum equipment. <br /> ' for underground utilities to five <br /> feet below ground surface (bgs) us <br /> 3.4 Proposed Well Destruction Activities <br /> ATC will contract with a C-57 drilling company to properly destroy the twenty wells. Each of the <br /> wells wilhen bel obverdnlleddto the depth ofl <br /> lthe original boring with to five feet beow ground surface zan eight ing air k inch minimum ife sdiamet. Each ryhlol hollow <br /> stem auger. Table 1 presents the well construction details for each well. <br /> Wells MW-6, MW-7, and MW-9 were completed in the City of Stockton right-of-way. <br /> 3.5 Waste Management <br /> The excavated soil and overdrilled material will be generated, and stored in <br /> an ported by a licensed waste hau err, and disposed of at an approved facilitya soil bin. It will be <br /> t <br /> 4.0 REPORTING <br /> ion activities will be submitted within 30 days of removal of <br /> A report documenting the well destruct <br /> waste. <br /> 3 <br />