My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SUTTER
>
145
>
2900 - Site Mitigation Program
>
PR0544561
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2026 11:19:09 AM
Creation date
2/27/2026 11:11:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0544561
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0025329
FACILITY_NAME
SAN JOAQUIN COUNTY HUMAN SERVICES AGENCY
STREET_NUMBER
145
Direction
S
STREET_NAME
SUTTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
145 S SUTTER ST STOCKTON 95202
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . INTRODUCTION <br /> The San Joaquin County Department of General Services (the County) tasked Weston Solutions, <br /> Inc (WESTONe) with preparing a work plan for site assessment at the Human Services Agency <br /> (I ISA) building located at 145 South Salter Street in Stockton, California (the Site). 'I he HSA <br /> building was constructed at the site of a fanner gasoline servrrc station which utilized <br /> underground storage tanks (USTs) thm had released petroleum hydrocarbons to subsurface soil <br /> and groundwater. This work plan has been prepared in rosponsc to the 21 March 2018 document <br /> review Ieuer submitted by the Central Valley Regional Water Quality Control Band (R WQCB). <br /> The objectives of like site assessment activities are to collect additional data required by RWQCB <br /> prior to evaluating the site for possible closure. The specific items requested in the 21 March 2018 <br /> letter include; <br /> 1 . Install and sample permanent soil gas wells near the southeast corner of the existing Site <br /> building. <br /> 2. Collect shallow soil samples near Sommer USTsfi through 9 and l l through 14 to complete <br /> soil assessment for all requested Misfire in these areas. <br /> 3. Coiled shallow soil samples near form USTs 4 through 9 and I I through 14 to assess the <br /> direct contact and outdoor air exposure risk pathways. <br /> 4. Colledsuffident soil samples to adequately address MTBE concentrations in on-Site soil. <br />
The URL can be used to link to this page
Your browser does not support the video tag.