Laserfiche WebLink
Away pappeLomraw. Cmdrmw <br /> 4.2.10 Demobilization and Sit cleanup <br /> Folluming demobinraton and siteclea Arta will restore the site to an unpaved condition <br /> The areas will be graded to match the pre- originalexcavation surfaceelevations.After )and grading activities, the final survey will be performed to confirm the original grade and establish he <br /> as-built elevations. <br /> C211 Feld Documentation <br /> iAmara Will in field documentationsufficient recreate all field activities. The informationInfll be <br /> ormation <br /> Will recanted In a a permanently bound notebook with sequentiallyred pages. following Info <br /> will be recorded for all field activities: <br /> Location <br /> 0 Identity ofpeople performing an activity <br /> atherwndaina <br /> • Was of the activities being conducted and observations <br /> 1 . Smpk identification numbers and chain of custody numbers; <br /> Numerical values and units will be recorded for all field measurements. The Identity of, and calibration <br /> s for, each field Instrument will be recorded. Field measurements and calibration results are <br /> recorded on field Log forms. <br /> Anna will complete a daily log and will submit Reld notes and records to the Army ct the end of each <br /> week. <br /> 4.2.12 Photographic Regard <br /> Ailing will obtain progress photos, which will comvit of photo documentation of work in digital format. <br /> Ulor photos will be taken and used to document the progress of all work. A minimum of four views a <br /> the site he location of the area art contamination, <br /> a reace/mat mad, and another notable site <br /> conditionswill be taken beforework begins. After thecommencement of work activities, photos <br /> reflecting site work progression will betaken and used for recordatbn. Photos will include: <br /> & Site <br /> ork <br /> conditions <br /> prints rrying, delineation, g <br /> • Sloping, excavations and soil mockpllinal <br /> 0 Well abandonment <br /> oil disposal characterization <br /> • Soil bading and transport in offsIt disposal facility (landfill <br /> • ackfill and son compaction <br /> • Unantichgated events such as spills or the dbccarery of additional contaminated material <br /> 0 Site or tas4apedfic employee respiratory and personal protections <br /> M Sim reAD�ion activities <br /> vtun/remedial action Factors la minimum of four views after com in p n of work at <br /> the site) <br /> Mmormrmmmmw, az 12 <br />