My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
700
>
2900 - Site Mitigation Program
>
PR0542279
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2026 2:38:45 PM
Creation date
2/27/2026 11:22:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542279
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024273
FACILITY_NAME
SHARPE ARMY DEPOT SHAD-136 (UST 12)
STREET_NUMBER
700
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
Inactive, non-billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
700 ROTH RD LATHROP 95330
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
commit Chavrnb <br /> I <br /> 5.0 Excavation Oversight Activities <br /> Remedial enavation <br /> and offsite disposal acuities oversight at SHAD-B6 markets of quality control (QQ <br /> and quality assurance IQA) activities conducted by Anna personnel and UMCE. <br /> 5.1 Quality Control <br /> QC encompasses the anions that control the attributes of material, sample, process, component, system, <br /> or facility in accordance with predetermined quality requirements. The QC inspection system dullretl by <br /> na personnel for the excavation mM and sampling is based on three phases of contend to cover <br /> definable features of onsitework The three phases are the pritteratortyrP e, initialphase, andfollow- <br /> upringth preparatory phase, work necessaryviity is ducked before fieldwork begs <br /> fire phase concluded meeting format duringltt the - health and safety meeting. <br /> include Anew dal, t reprea and o subcontractor <br /> the sting information regaining t e schedule, pm r mere, and the status ofthe <br /> related construction aRW'm is shared and discussed. Lessons learned tram previous events am shared <br /> and discussed. <br /> Initial phase Inspections are conducted after activities begin to verify and document work is being <br /> performed as discussed during the preparatory phase inspection. The M Inspector Is responsible for <br /> moniftonfingthe quality ofthe work performed. During the initial phase inspection,a representative sample <br /> of work is observed to verify to work is in compliance with the specified requirements. <br /> 1 follow- p phase nspection m performed daily after the a un <br /> it id the completion of the work <br /> to verify and document that work is being performed according to phns. <br /> 5.2 Quality Assurance <br /> QA Includes the planned and systematic actions necessary to provide a sufficient confidence level that <br /> istructure, system, or component will perform satisfactorily in servlce. GA Includes a mull-disciplinary <br /> system of management controls backed by quality verification and overview allWfties that demonstrate <br /> completeness and appropeiderees of achieved quality. QA Inspections are performed during field <br /> robes by USAGE personnel to ensure the work is completed as planned.The adfvades described in this <br /> Work Plan will be conducted in accordance with the Quality Assurvnre Proyee Plan lUg5 2014cl. <br /> Il <br /> l <br /> it <br /> Ammo Eawrmme m. Me. 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.