Laserfiche WebLink
commit Chavrnb <br /> I <br /> 5.0 Excavation Oversight Activities <br /> Remedial enavation <br /> and offsite disposal acuities oversight at SHAD-B6 markets of quality control (QQ <br /> and quality assurance IQA) activities conducted by Anna personnel and UMCE. <br /> 5.1 Quality Control <br /> QC encompasses the anions that control the attributes of material, sample, process, component, system, <br /> or facility in accordance with predetermined quality requirements. The QC inspection system dullretl by <br /> na personnel for the excavation mM and sampling is based on three phases of contend to cover <br /> definable features of onsitework The three phases are the pritteratortyrP e, initialphase, andfollow- <br /> upringth preparatory phase, work necessaryviity is ducked before fieldwork begs <br /> fire phase concluded meeting format duringltt the - health and safety meeting. <br /> include Anew dal, t reprea and o subcontractor <br /> the sting information regaining t e schedule, pm r mere, and the status ofthe <br /> related construction aRW'm is shared and discussed. Lessons learned tram previous events am shared <br /> and discussed. <br /> Initial phase Inspections are conducted after activities begin to verify and document work is being <br /> performed as discussed during the preparatory phase inspection. The M Inspector Is responsible for <br /> moniftonfingthe quality ofthe work performed. During the initial phase inspection,a representative sample <br /> of work is observed to verify to work is in compliance with the specified requirements. <br /> 1 follow- p phase nspection m performed daily after the a un <br /> it id the completion of the work <br /> to verify and document that work is being performed according to phns. <br /> 5.2 Quality Assurance <br /> QA Includes the planned and systematic actions necessary to provide a sufficient confidence level that <br /> istructure, system, or component will perform satisfactorily in servlce. GA Includes a mull-disciplinary <br /> system of management controls backed by quality verification and overview allWfties that demonstrate <br /> completeness and appropeiderees of achieved quality. QA Inspections are performed during field <br /> robes by USAGE personnel to ensure the work is completed as planned.The adfvades described in this <br /> Work Plan will be conducted in accordance with the Quality Assurvnre Proyee Plan lUg5 2014cl. <br /> Il <br /> l <br /> it <br /> Ammo Eawrmme m. Me. 14 <br />