My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
600
>
2900 - Site Mitigation Program
>
PR0548753
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2026 11:33:41 AM
Creation date
3/2/2026 11:15:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548753
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027916
FACILITY_NAME
BOBSON CLEANERS, INC.
STREET_NUMBER
600
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22314117
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
600 N MAIN ST MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
558
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Universal Health & Safety Plan <br /> For use on all high-risk,industrial and HAZWOPER projects <br /> Department of Toxic Substances Control <br /> 10. Roles and Responsibilities <br /> 10.1 AECOM Project Manager <br /> The Project Manager(PM)has overall management authority and responsibility for all site operations, including safety. The PM <br /> will provide the site supervisor with work plans, staff, and budgetary resources,which are appropriate to meet the safety needs <br /> of the project operations. Some of the PM's specific responsibilities include: <br /> ■ Develop a defined scope of work and project schedule with clear objectives and reasonable milestones. <br /> ■ Budget and allocate the appropriate resources to safely and efficiently complete the work, including technical, <br /> safety and quality reviews. <br /> ■ Prepare a project risk register to support project planning and risk management. <br /> ■ Identify requirements and expectations applicable to the scope of work, site access, client and host facility. <br /> ■ Assemble qualified project and field teams, including subcontractors,with the appropriate training, education and <br /> experience. <br /> ■ Ensure subcontractors are approved in subport and obtain variances for those that have been conditionally <br /> approved. <br /> ■ Review and approve the AECOM safe work plan (SWP)or health and safety plan (HASP)and task hazard <br /> assessments(THAs). <br /> ■ Obtain and review subcontractor SWP/HASP and THAs or equivalent task risk assessment documents. <br /> ■ Conduct a project kick-off meeting to convey information, requirements,and expectations to the field team. <br /> ■ Ensure the field team has all the tools, equipment, instruments, and supplies, including PPE,to perform the work <br /> safely. <br /> ■ Coordinate field activities with the client and/or host facility. <br /> ■ Be visible to and maintain regular communication with the field team. <br /> ■ Verify that technical,safety, and quality reviews are completed as planned. <br /> ■ Verify that AECOM's SH&E policies and procedures are fully implemented. <br /> ■ Coordinate the management of changes identified by the field team. <br /> ■ Address and correct unsafe acts/behaviors and conditions. <br /> ■ Confirm observation, near miss and incident notification and reporting are completed internally,to site and client, <br /> as required. <br /> ■ Conduct a post project review. <br /> ■ Lead by example—walk the talk. <br /> 10.2 AECOM Site Supervisor <br /> The Site Supervisor has the overall responsibility and authority to direct work operations at the job site according to the provided <br /> work plans and HASP.The Project Manager may act as the Site Supervisor while on site. The Site Supervisor's responsibilities <br /> include: <br /> ■ Verify the personnel,equipment/machinery and instruments anticipated to mobilize to site. <br /> ■ Communicate project roles and responsibilities. <br /> ■ Discuss planned activities for the day and any potential simultaneous operations. <br /> ■ Establish staging and work areas for planned activities. <br /> ■ Confirm crews have reviewed and updated, as necessary,task hazard assessments prior to beginning the task. <br /> ©AECOM Restricted <br /> Universal Heath and Safety Plan Template(S4(DSC)AM-209-FM-C) 30 <br /> Revision 12 September 9,2021 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. <br />
The URL can be used to link to this page
Your browser does not support the video tag.