My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
600
>
2900 - Site Mitigation Program
>
PR0548753
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2026 11:33:41 AM
Creation date
3/2/2026 11:15:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548753
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027916
FACILITY_NAME
BOBSON CLEANERS, INC.
STREET_NUMBER
600
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22314117
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
600 N MAIN ST MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
558
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Universal Health & Safety Plan <br /> For use on all high-risk,industrial and HAZWOPER projects <br /> Department of Toxic Substances Control <br /> 11 . Subcontractor Management <br /> 11 .1 AECOM Roles/Responsibilities for Sub Management <br /> When managing an AECOM Subcontractor of any tier,AECOM management and supervision will follow the requirements in <br /> S3AM-213-PR1 and are responsible for the following: <br /> ■ Direct all activities of the facility, site, or project location. <br /> ■ Ensure appropriate training and experience of AECOM personnel responsible for overseeing subcontractor work. <br /> ■ Verify subcontractors have the appropriate trained and competent personnel to perform their activities in a safe, <br /> healthful, and environmentally responsible manner. <br /> ■ Pre-qualification of Subcontractor—Prior to performing work on an AECOM project, management and supervision <br /> must verify the Subcontractor has been pre-qualified.AECOM's preferred method of prequalification is Subport, <br /> but there are other ways to prequalify a subcontractor. <br /> ■ Ensure all subcontractor employees attend the AECOM daily tailgate safety meeting. <br /> ■ If you have any questions about subcontractor pre-qualification, reach out to an AECOM SH&E professional. <br /> 11 .2 Subcontractor Roles/Responsibilities for Safety <br /> Subcontractors must provide AECOM with a designated Subcontractor Safety Representative(SSR).Their responsibilities are <br /> as follows: <br /> ■ Direct employees'means and methods of work and how to work safely. <br /> ■ Be knowledgeable of and understand the safety requirements of the subcontractor's activities. <br /> ■ Staff the project with employees that are trained and knowledgeable of the tasks they will be performing. <br /> ■ Have the ability to recognize hazards and the authority to take prompt corrective actions. <br /> ■ Implement the subcontractor safety program. <br /> ■ Serve as the direct contact with AECOM regarding resolution of SH&E issues. <br /> ■ Immediately report all work-related injuries/illnesses/incidents, environmental incidents and regulatory <br /> inspections/violations to AECOM according to AECOM procedures and/or client requirements. <br /> 11 .3 Subcontractor HASP/THAs <br /> If the subcontractor's scope of work includes hazards that are not covered by the AECOM Health and Safety Plan (HASP), the <br /> subcontractor will need to provide AECOM with their site-specific HASP and task-specific Task Hazard Analyses(THAs).All <br /> subcontractor procedures must at a minimum comply with client and AECOM requirements to ensure that hazards associated <br /> with the performance of their work activities are properly controlled. Copies of any required safety documentation for a <br /> subcontractor's work activities will be provided to AECOM for review prior mobilization to the site. <br /> ©AECOM Restricted <br /> Universal Heath and Safety Plan Template(S4(DSC)AM-209-FM-C) 33 <br /> Revision 12 September 9,2021 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. <br />
The URL can be used to link to this page
Your browser does not support the video tag.