Laserfiche WebLink
Universal Health & Safety Plan <br /> For use on all high-risk,industrial and HAZWOPER projects <br /> Department of Toxic Substances Control <br /> 15. Environmental Management <br /> 15.1 Scope <br /> AECOM implements policies and procedures to reduce risk of land and/or water pollution and other environmental concerns <br /> during the life of the project. The AECOM Project Manager will ensure compliance with all local, state,federal and client <br /> environmental laws and/or regulations. For additional information on Environmental Management, please review the <br /> Environmental Compliance procedure, S3AM-204-PR1. <br /> 15.2 Roles and Responsibilities <br /> All AECOM staff through the leadership of the AECOM Project Manager are responsible for reducing or eliminating <br /> environmental impacts by AECOM personnel.The site supervisor and/or the site safety officer will be immediately notified of any <br /> spills, leaks, or other impacts to the ground and/or water, or other environmental emergencies, after emergency respondents <br /> have been called, if necessary.The Project Manager will be responsible for making any further notifications as required. <br /> 15.3 Staffing and Awareness <br /> AECOM staff will receive relevant awareness training to ensure proper knowledge and training when performing activities with <br /> the potential to impact the environment, as well as the requirement of this plan for proper preparedness and response. <br /> 15.4 Pollution Prevention <br /> Pollution/impact to the environment could be caused by the following sources: <br /> ■ Air emissions ■ Solid waste <br /> ■ Wastewater ■ Hydrocarbons <br /> ■ Hazardous materials ■ Storm water and sediment/erosion <br /> AECOM will employ prevention and control measures to prevent impacts to the environment. In addition, a spill kit consisting of <br /> sorbent socks, pads, shovels, and personal protective equipment(PPE)will be maintained on site by AECOM and each <br /> subcontractor. <br /> Solid waste will be collected, segregated (recyclable, non-flammable,and flammable)and removed on a regular basis. <br /> 15.5 Waste Management <br /> AECOM and AECOM subcontractor activities are anticipated to generate the following waste streams/products that will require <br /> handling, management and disposal: <br /> .. <br /> Solid waste including soil, construction debris, (Solid and liquid investigation-derived wastes (IDWs)will be consolidated into <br /> and used PPE. Liquid waste including separate U.S. Department of Transportation (DOT)-approved 55-gallon <br /> ©AECOM Restricted <br /> Universal Heath and Safety Plan Template(S4(DSC)AM-209-FM-C) 41 <br /> Revision 12 September 9,2021 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. <br />