My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
600
>
2900 - Site Mitigation Program
>
PR0548753
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2026 11:33:41 AM
Creation date
3/2/2026 11:15:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548753
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027916
FACILITY_NAME
BOBSON CLEANERS, INC.
STREET_NUMBER
600
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22314117
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
600 N MAIN ST MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
558
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Universal Health & Safety Plan <br /> For use on all high-risk,industrial and HAZWOPER projects <br /> Department of Toxic Substances Control <br /> • AECOM Auditsand Inspections <br /> The AECOM audit and inspection process establishes the protocol for the assessment of the SH&E program and its application, <br /> as well as the process to identify and monitor corrective actions.The goal is to minimize risk and enhance operational SH&E <br /> performance. For more information on audits and inspections, please review the Compliance Assurance procedure, S3AM-216- <br /> PR1. <br /> 16.1 Project Manager Self Assessments <br /> AECOM Project Managers will perform quarterly SH&E site audits using the AECOM Design Consulting Services Americas <br /> (DCSA) Project Manager Self-Assessment form available in IndustrySafe. <br /> 16.2 Senior Management Activities (SMAs) <br /> AECOM Senior Managers will perform Senior Management Activity inspections on the projects under their area of responsibility. <br /> These SMAs will be entered into Lifeguard. <br /> 16.3 Project Safety Reviews (PSRs) <br /> AECOM SH&E Managers will perform periodic Project Safety Reviews on projects in their area of responsibility.These PSRs <br /> will be entered into IndustrySafe. <br /> 16.4 Site Safety Inspections (OSHA Type) <br /> AECOM Project Managers and SH&E Managers will perform periodic site safety inspections(OSHA type)on projects in their <br /> area of responsibility as required. These site safety inspections will be entered into IndustrySafe. <br /> 16.5 External Regulatory Inspections <br /> If a regulatory inspector shows up on site,AECOM will follow the requirements in our Regulatory Inspections procedure S3AM- <br /> 211-PR1. <br /> ©AECOM Restricted <br /> Universal Heath and Safety Plan Template(S4(DSC)AM-209-FM-C) 43 <br /> Revision 12 September 9,2021 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. <br />
The URL can be used to link to this page
Your browser does not support the video tag.