My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
600
>
2900 - Site Mitigation Program
>
PR0548753
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2026 11:33:41 AM
Creation date
3/2/2026 11:15:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548753
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027916
FACILITY_NAME
BOBSON CLEANERS, INC.
STREET_NUMBER
600
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22314117
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
600 N MAIN ST MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
558
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AHCOM <br /> 4.21.4 The SH&E Manager shall be contacted prior to the decommissioning of compressed gas cylinders <br /> that contain or previously contained: <br /> • Ethylene oxide, <br /> • Arsine, <br /> • Diborane, <br /> • Hydrogen selenide, <br /> • Cyanogen chloride, <br /> • Amines, <br /> • Hydrogen sulfide, <br /> • Acetylene, or <br /> • Methyl mercaptan. <br /> 4.21.5 Additional safety precautions may be necessary due to highly reactive residues left behind by these <br /> substances. <br /> 4.21.6 The recommended methods of decommissioning include: <br /> • Burning/torch-cutting an elongated hole into the side of the cylinder, refer to <br /> S3AM-332-PR1 Hot Work,- <br /> Torch-cutting the cylinder in half; and <br /> • Crushing the cylinder. <br /> 5.0 Records <br /> 5.1 None <br /> 6.0 Attachments <br /> 6.1 S3AM-114-ATT1 Compressor Safety <br /> 6.2 S3AM-114-FM1 Compressed Gas Cylinder Inspection <br /> Compressed Gases(S3AM-114-PR1) <br /> Revision 3 September 30,2020 <br /> PRINTED COPIES ARE UNCONTROLLED. CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. 12 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.