Laserfiche WebLink
AECOM <br /> • Prepare emergency action plans as part of project SH&E Plans and emergency reference <br /> sheets; <br /> • Interface with the local emergency responders when necessary; <br /> • Interface with clients regarding facility emergency response procedures; <br /> • Decide whether AECOM or an outside emergency response company will clean up the spill; <br /> • Report spills, as necessary, to state/provincial environmental agencies; <br /> • Review the incident report and facilitate the post-response discussion; <br /> • Review and revise this procedure as necessary based on recommendations from post- <br /> response discussions; <br /> • Advise Managers and Supervisors on the necessary decontamination procedures for the <br /> known or reasonably anticipated chemical hazards and physical agents associated with the <br /> planned scope of work; <br /> • Support the project team to verify that adequate protective measures are in-place(e.g. <br /> Engineering Controls,Administrative Controls, Personal Protective Equipment, etc.). <br /> 4.1.3 Site Safety Officer(SSO) <br /> • Verify that a SH&E PLAN is available for the project and is reviewed prior to the <br /> commencement of site activities; <br /> • Conduct pre-entry briefing and daily tailgate meetings and review facility, site-specific <br /> emergency procedures, and site specific decontamination procedures; <br /> • Communicate the site-specific emergency response details to all employees assigned to a field <br /> project; <br /> • Establish the designated site work zones (e.g., EZ, CRZ, SZ, etc.); <br /> • Enforce the applicable decontamination steps as defined in the approved SH&E Plan; <br /> • Initiate Stop Work and emergency response procedures as required; <br /> • Account for all AECOM and subcontractor employees after site evacuation; <br /> • Brief on-site and off-site responders in the event of an emergency; <br /> • Conduct site-specific training on the applicable decontamination steps/procedures; <br /> • Procure the necessary decontamination supplies and establishing the decontamination line; <br /> 4.1.4 Employees <br /> • Maintain HAZWOPER training, or equivalent training as it relates to the given jurisdiction; <br /> • Follow the SH&E Plan and emergency procedures prepared for the project; <br /> • Initiate Stop Work if necessary; <br /> • Initiate emergency response via verbal communications or the alarm system if first to <br /> encounter an emergency; <br /> • Follow the defined decontamination steps as stated in the approved SH&E Plan; <br /> • Follow precautions and safe handling practices to avoid spills; <br /> • Alert Manager to any deteriorating hazardous materials containers within the office or project <br /> area; <br /> • Report all spills and leaks to the Manager immediately; <br /> • Secure the spill area as quickly as possible and prevent the migration of exterior spilled <br /> materials or substances to drains or other openings; and <br /> Hazardous Waste Operations(S3AM-117-PR1) <br /> Revision 3 July31,2019 <br /> PRINTED COPIES ARE UNCONTROLLED. CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. 5 of 21 <br />