My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
600
>
2900 - Site Mitigation Program
>
PR0548753
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2026 11:33:41 AM
Creation date
3/2/2026 11:15:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548753
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027916
FACILITY_NAME
BOBSON CLEANERS, INC.
STREET_NUMBER
600
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22314117
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
600 N MAIN ST MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
558
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A=COM <br /> 3.13 S3AM-331-FM1 Underground Utilities&Subsurface Installation Clearance Checklist <br /> 4.0 Procedure <br /> 4.1 Roles and Responsibilities <br /> 4.1.1 Manager <br /> • Confirm the development of the project SH&E Plan and compliance with this procedure. <br /> • Confirm the appropriate equipment and materials are available to conduct the drilling, boring or <br /> direct-push operations. <br /> • Confirm compliance with S3AM-331-PR1 Underground Utilities. <br /> • Review the S3AM-331-FM1 Underground Utilities&Subsurface Installation Clearance <br /> Checklist prior to authorizing work to proceed. <br /> • Confirm that employees conducting drilling, boring or direct-push probing possess any required <br /> training, registrations or certifications. <br /> • Confirm all employees involved and affected by the task review the SH&E Plan, S3AM-331- <br /> FM1 Underground Utilities&Subsurface Installation Clearance Checklist and Task Hazard <br /> Assessment(THA)prior to work commencing. <br /> • Confirm an equipment maintenance inventory is maintained, schedules adhered to and <br /> appropriate inspections of equipment are conducted. <br /> • Provide authorization (with the concurrence of the Site Supervisor and SH&E Manager)for <br /> work to resume if interrupted due to unexpected conditions or events. <br /> 4.1.2 Safety, Health &Environment(SH&E)Manager <br /> • Assist AECOM management as needed by providing guidance and clarification as to issues <br /> that may arise. <br /> • Review the project SH&E Plan to confirm compliance with jurisdictional regulations. Provide <br /> technical guidance as needed when a variance is pursued related to this procedure. Confirm <br /> variance process meets requirements identified in S2-001-SM1 Global SH&E Management <br /> System Manual. <br /> 4.1.3 Employees <br /> • Maintain training as appropriate to the work to be completed (e.g., ground disturbance, lockout <br /> tagout, equipment operation, etc.). Refer to S3AM-003-PR1 SH&E Training. <br /> • Review the SH&E Plan, S3AM-331-FM1 Underground Utilities& Subsurface Installation <br /> Clearance Checklist and Task Hazard Assessment(THA)prior to work commencing. <br /> • As appropriate to the anticipated or encountered hazards and as addressed in the applicable <br /> planning documentation, utilize appropriate personal protective equipment(PPE)and <br /> applicable training, practices and operating procedures. <br /> • Immediately notify the Manager of any unanticipated conditions or events. If assigned <br /> equipment, perform appropriate inspections and confirmations of maintenance and/or repairs. <br /> 4.2 Training <br /> 4.2.1 All on-site employees involved with drilling, boring, and direct-push probing shall be trained, at a <br /> minimum, in these procedures and in the procedures of S3AM-331-PR1 Underground Utilities. <br /> 4.2.2 All operators and assistants shall have the appropriate safety training based on the SH&E Training <br /> Matrix and any additional training assessments developed at the business group, and be versed in <br /> the equipment to be utilized. <br /> • Refer to S3AM-003-PR1 SH&E Training. <br /> Drilling,Boring,&Direct Push Probing(S3AM-321-PR1) <br /> Revision 2 July 31,2019 <br /> PRINTED COPIES ARE UNCONTROLLED. CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. Page 2 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.