Laserfiche WebLink
A=COM <br /> • Drilling operations on an MEC/UXO site will not be conducted until a complete plan for the <br /> site is prepared and approved by the AECOM UXO Safety Officer. MEC/UXO avoidance <br /> shall be conducted during drilling operations on known or suspect MEC/UXO sites. <br /> • The UXO team will identify and distinctly mark the boundaries of a clear approach path for the <br /> drilling crews, vehicles, and equipment to enter the site. This path will be, at a minimum, twice <br /> the width of the widest vehicle. No personnel will be allowed outside any marked boundary. <br /> • If MEC/UXO is encountered on the ground surface,the UXO team will clearly mark the area <br /> where it is found, report it to the proper authorities, and divert the approach path around it. <br /> • The UXO team will conduct an access survey using the appropriate geophysical instrument <br /> over the approach path for avoidance of MEC/UXO that may be in the subsurface. If a <br /> magnetic anomaly is encountered, it will be assumed to be MEC/UXO, and the approach path <br /> will be diverted around the anomaly. UXO personnel only will operate the appropriate <br /> geophysical instrument and identify MEC/UXO. <br /> • An incremental geophysical survey of the drill-hole location(s)will be initially accomplished by <br /> the UXO team using a hand auger to install a pilot hole. If MEC/UXO is encountered or an <br /> anomaly cannot be positively identified as inert material, Hazardous,Toxic, and Radioactive <br /> Waste (HTRW)sampling personnel will select a new drill-hole location. <br /> • Once the surface of a drilling site has been cleared and a pilot hole established as described <br /> above,the drilling contractor will be notified that the site is available for subsurface drilling. <br /> 4.21 Movement and Transport of Drilling, Boring or Direct-Push Equipment <br /> 4.21.1 Personnel transporting equipment shall be properly licensed and shall operate the vehicle <br /> according to Federal/State/Provincial/Territorial, and local regulations. Refer to S3AM-005-PR1 <br /> Driving and S3AM-320-PR1 Commercial Motor Vehicles. <br /> 4.21.2 Confirm the traveling height(overhead clearance),width, length and weight of the equipment with <br /> the carrier. Identify highway and bridge load,width and overhead limits, to confirm these limits are <br /> not exceeded and with adequate margin. <br /> 4.21.3 Allow for overhang of any drilling, boring or direct-push equipment when cornering or approaching <br /> other vehicles or structures. <br /> 4.21.4 Be aware that the canopies of service stations and motels are often too low for equipment loaded <br /> on a trailer to clear <br /> 4.21.5 Watch for low hanging electrical lines, particularly at the entrances to drilling sites or restaurants, <br /> motels, other commercial sites. <br /> 4.21.6 Never travel on a street, road, or highway with any part of the drilling, boring or direct-push <br /> equipment in a raised or partially raised position. <br /> 4.21.7 Remove all ignition keys if rig is left unattended unless client requirements specify that the keys <br /> remain in the ignition switch at all times. <br /> 4.21.8 Before moving a rig on location,the operator shall do the following: <br /> • To the extent practical,walk the planned route of travel and inspect it for depressions, gullies, <br /> ruts, and other obstacles. <br /> • Check the brakes of the truck/carrier, especially if the terrain along the route of travel is rough <br /> or sloped. <br /> • Discharge all passengers before moving on rough or steep terrain. <br /> 4.21.9 Engage the front axle (on 4x4, 6x6, etc., vehicles)before traversing rough or steep terrain <br /> 4.21.10 Driving drill rigs along the sides of hills or embankments should be avoided; however, if side-hill <br /> travel becomes necessary,the operator shall conservatively evaluate the ability of the rig to remain <br /> upright while on the hill or embankment. The possibility shall be considered that the presence of <br /> Drilling,Boring,&Direct Push Probing(S3AM-321-PR1) <br /> Revision 2 July 31,2019 <br /> PRINTED COPIES ARE UNCONTROLLED. CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. Page 11 of 12 <br />