Laserfiche WebLink
A=COM <br /> 3.0 References <br /> 3.1 S3AM-003-PR1 SH&E Training <br /> 3.2 S3AM-303-PR1 Excavation <br /> 3.3 S3AM-321-PR1 Drilling, Boring&Direct-Push Probing <br /> 4.0 Procedure <br /> 4.1 Roles and Responsibilities <br /> 4.1.1 Manager <br /> • Administer this procedure and the development of the SH&E Plan. <br /> • Confirm the appropriate equipment and materials are available to conduct the underground <br /> utility and/or subsurface installation clearance. <br /> • Confirm all employees involved and affected by the task review the SH&E Plan and Task <br /> Hazard Assessment(THA) prior to work commencing <br /> • Authorize work to proceed using the S3AM-331-FM1 Underground Utility&Subsurface <br /> Installation Clearance Checklist. <br /> • Confirm that employees conducting underground utilities and subsurface clearance processes <br /> possess all required training, registrations or certifications. <br /> • Provide authorization (with the concurrence of the Site Supervisor and SH&E Manager)for <br /> work to resume if interrupted due to unexpected conditions or events. <br /> 4.1.2 Safety, Health &Environment(SH&E) Manager <br /> • Assist AECOM management as needed by providing guidance and clarification as to issues <br /> that may arise. <br /> • Review the SH&E Plan to confirm compliance with jurisdictional regulations. Provide technical <br /> guidance as needed when a variance is pursued related to this procedure. <br /> 4.1.3 Employees <br /> • Maintain training as appropriate to the work to be completed (e.g. ground disturbance, lockout <br /> tagout, equipment operation, etc.). Refer to S3AM-003-PR1 SH&E Training. <br /> • Review the SH&E Plan and Task Hazard Assessment(THA) prior to work commencing. <br /> • As appropriate to the anticipated or encountered hazards and as addressed in the applicable <br /> planning documentation, utilize appropriate personal protective equipment(PPE)and <br /> applicable training, practices and operating procedures. <br /> • Immediately notify the Manager of any unanticipated conditions or events. If assigned <br /> equipment, perform appropriate inspections and confirmations of maintenance and/or repairs. <br /> 4.2 Training <br /> 4.2.1 All on-site employees involved with the underground utility and subsurface identification and <br /> associated clearance process shall be trained, at a minimum, in these procedures. <br /> 4.2.2 Employees shall complete all required training associated with their tasks in accordance with the <br /> SH&E Training Matrix and any training assessments developed at the business group. <br /> • Refer to S3AM-003-PR1 SH&E Training. <br /> • This training may include, but is not limited to, Excavation/Trenching (Ground Disturbance), <br /> HAZWOPER, Petroleum Safety Training (or Construction Safety Training), and H2S Alive as <br /> appropriate. <br /> Underground Utilities(S3AM-331-PR1) <br /> Revision 2 September 30,2020 <br /> PRINTED COPIES ARE UNCONTROLLED. CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. Page 2 of 8 <br />