My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
600
>
2900 - Site Mitigation Program
>
PR0548753
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2026 11:33:41 AM
Creation date
3/2/2026 11:15:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548753
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027916
FACILITY_NAME
BOBSON CLEANERS, INC.
STREET_NUMBER
600
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22314117
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
600 N MAIN ST MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
558
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cleanup in Vulnerable Communities'Initiative Final Project Reference:Bobson Cleaners <br /> Discovery and Enforcement Discovery Project Number:60688620-5.1 <br /> Investigation Work Plan <br /> will check every entry on the data tables for completeness and correctness. Similarly,figures(including boring logs) <br /> to be published in the CVCI-D&E report will be checked by an independent person to verify that all data on the figures <br /> (including soil classifications, PID readings, etc. on the boring logs)are correct.All project documentation, including <br /> field records, laboratory reports, data review memoranda,and data tables, will be retained in AECOM project files, <br /> and be made available to other parties as needed and appropriate. <br /> 4.5 Assessment Oversight <br /> Ultimate responsibility for implementation of this Work Plan, including the QA/QC plan,will rest with the AECOM PM. <br /> However,the QA Manager will have responsibility for assuring that all of the QA/QC procedures are implemented, <br /> and the QA Manager will have authority to correct identified QA/QC deficiencies in field or analytical procedures.The <br /> QA Manager will accomplish such corrections by notifying the PM of the identified deficiency and recommending <br /> corrective action, so that the PM can implement the corrective action.The QA Manager will perform at least one audit <br /> of field procedures,and will review the field notebooks, other field forms, chain-of-custody forms, and laboratory <br /> reports for compliance with the QA/QC plan. <br /> Prepared for: Department of Toxic Substances Control AECOM <br /> 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.