My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
600
>
2900 - Site Mitigation Program
>
PR0548753
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2026 11:33:41 AM
Creation date
3/2/2026 11:15:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548753
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027916
FACILITY_NAME
BOBSON CLEANERS, INC.
STREET_NUMBER
600
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22314117
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
600 N MAIN ST MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
558
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AECOM <br /> Americas <br /> Underground Utilities & Subsurface Installation <br /> Clearance Checklist S3AM-331-FM1 <br /> Location: Project#: Date&Time: <br /> Manager: Contractor(if applicable): Weather: <br /> Client: Inspector: <br /> Notes: <br /> Part 1 <br /> Part 1 and Part 2 shall be completed prior to any intrusive subsurface work. DO NOT DISTURB GROUND if a "No"or <br /> "N/A"answer to any of the Part 1 questions has not been initialed as authorized by the AECOM Manager. <br /> Any variance from these procedures requires approval of the Vice President of the applicable business group. <br /> Yes No N/A <br /> I. Permits and Access Agreements <br /> 1. Have all appropriate permits and agreements been identified and obtained (e.g. client, ❑ ❑ ❑ <br /> drilling,encroachment,working near railroads, etc.)? <br /> 2. Have all client requirements been identified and obtained? ❑ ❑ ❑ <br /> 3. If working off-site is (are)site access agreement(s)executed? ❑ ❑ ❑ <br /> II. General Health and Safety <br /> 1. Has a Health and Safety Plan (HASP)been prepared for AECOM employees? ❑ ❑ ❑ <br /> 2. Do on-site personnel have required-level PPE? ❑ ❑ ❑ <br /> 3. Do on-site personnel have required-level of training? ❑ ❑ ❑ <br /> 4. Is appropriate monitoring equipment as specified in HASP/THAs available at each clearance ❑ ❑ ❑ <br /> location? <br /> 5. Has the field screening equipment been calibrated as required by the HASP? ❑ ❑ ❑ <br /> 6. Are calibration gases available at the site? ❑ ❑ ❑ <br /> III. Identification and Mapping of Utility and Subsurface Structures <br /> 1. Is a Site Plan showing proposed subsurface locations and utility locations attached to this ❑ ❑ ❑ <br /> check list? <br /> 2. Have above/below ground utilities&subsurface installations been investigated (Part 2 of this ❑ ❑ ❑ <br /> form)? <br /> 3. Have all Federal/State/Provincial/Territorial and other"One Call"providers marked their <br /> facilities or otherwise notified they do not have any facilities near the proposed ❑ ❑ ❑ <br /> subsurface/intrusive locations? <br /> 4. Have Federal/State/Provincial/Territorial or other"One Call"providers identified what utilities <br /> and underground structures are not included in their provider system (e.g. underground ❑ ❑ ❑ <br /> structures)? <br /> 5. As noted in the exception at the bottom of Section VI of this checklist, has a utility locating <br /> contractor performed geophysical and/or other surveys of the proposed subsurface/intrusive ❑ ❑ ❑ <br /> locations? <br /> Underground Utilities&Subsurface Installations Clearance Checklist(SMM-331-FM1) <br /> Revision 1 September 30,2020 <br /> PRINTED COPIES ARE UNCONTROLLED. CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.