AECOM <br /> Americas <br /> Underground Utilities & Subsurface Installation <br /> Clearance Checklist S3AM-331-FM1 <br /> Location: Project#: Date&Time: <br /> Manager: Contractor(if applicable): Weather: <br /> Client: Inspector: <br /> Notes: <br /> Part 1 <br /> Part 1 and Part 2 shall be completed prior to any intrusive subsurface work. DO NOT DISTURB GROUND if a "No"or <br /> "N/A"answer to any of the Part 1 questions has not been initialed as authorized by the AECOM Manager. <br /> Any variance from these procedures requires approval of the Vice President of the applicable business group. <br /> Yes No N/A <br /> I. Permits and Access Agreements <br /> 1. Have all appropriate permits and agreements been identified and obtained (e.g. client, ❑ ❑ ❑ <br /> drilling,encroachment,working near railroads, etc.)? <br /> 2. Have all client requirements been identified and obtained? ❑ ❑ ❑ <br /> 3. If working off-site is (are)site access agreement(s)executed? ❑ ❑ ❑ <br /> II. General Health and Safety <br /> 1. Has a Health and Safety Plan (HASP)been prepared for AECOM employees? ❑ ❑ ❑ <br /> 2. Do on-site personnel have required-level PPE? ❑ ❑ ❑ <br /> 3. Do on-site personnel have required-level of training? ❑ ❑ ❑ <br /> 4. Is appropriate monitoring equipment as specified in HASP/THAs available at each clearance ❑ ❑ ❑ <br /> location? <br /> 5. Has the field screening equipment been calibrated as required by the HASP? ❑ ❑ ❑ <br /> 6. Are calibration gases available at the site? ❑ ❑ ❑ <br /> III. Identification and Mapping of Utility and Subsurface Structures <br /> 1. Is a Site Plan showing proposed subsurface locations and utility locations attached to this ❑ ❑ ❑ <br /> check list? <br /> 2. Have above/below ground utilities&subsurface installations been investigated (Part 2 of this ❑ ❑ ❑ <br /> form)? <br /> 3. Have all Federal/State/Provincial/Territorial and other"One Call"providers marked their <br /> facilities or otherwise notified they do not have any facilities near the proposed ❑ ❑ ❑ <br /> subsurface/intrusive locations? <br /> 4. Have Federal/State/Provincial/Territorial or other"One Call"providers identified what utilities <br /> and underground structures are not included in their provider system (e.g. underground ❑ ❑ ❑ <br /> structures)? <br /> 5. As noted in the exception at the bottom of Section VI of this checklist, has a utility locating <br /> contractor performed geophysical and/or other surveys of the proposed subsurface/intrusive ❑ ❑ ❑ <br /> locations? <br /> Underground Utilities&Subsurface Installations Clearance Checklist(SMM-331-FM1) <br /> Revision 1 September 30,2020 <br /> PRINTED COPIES ARE UNCONTROLLED. CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. Page 1 of 4 <br />