Laserfiche WebLink
A=COM <br /> Part 1 and Part 2 shall be completed prior to any intrusive subsurface work. DO NOT DISTURB GROUND if a "No"or <br /> "N/A"answer to any of the Part 1 questions has not been initialed as authorized by the AECOM Manager. <br /> Any variance from these procedures requires approval of the Vice President of the applicable business group. <br /> Yes No N/A <br /> 6. Visual verification that each of the proposed locations does not lie on a line connecting two ❑ ❑ ❑ <br /> similar manhole covers(e.g. sanitary sewer or storm drain)? <br /> 7. Visual verification that the ground in the vicinity of each of the proposed subsurface <br /> locations has not subsided, been excavated and patched,give the appearance it may be <br /> covering a former trench (e.g. linear cracks, sagging curbs, linear re-pavements, etc.)and ❑ ❑ ❑ <br /> does not lie on a line with any water, gas, electrical meters, utility cleanouts,or other utility <br /> boxes in the surrounding areas? <br /> IV. Site Walk <br /> 1. Has a site walk been performed that includes the following: ❑ ❑ ❑ <br /> a. Reviewing all planned intrusive locations? ❑ ❑ ❑ <br /> b. Adjusting locations away from subsurface utilities and installations? ❑ ❑ ❑ <br /> c. Determining the appropriate utility clearance activities for each location? ❑ ❑ ❑ <br /> d. Determining the presence and location of overhead utilities and obstructions? ❑ ❑ ❑ <br /> e. Walk around perimeter of the site to observe physical hazards? ❑ ❑ ❑ <br /> f. Includes 50 feet(15.2 meters)from perimeter of the site to observe physical hazards ❑ ❑ ❑ <br /> and 50 feet(15.2 meters)radius from each proposed subsurface location? <br /> V. Proposed Subsurface Investigation Locations* <br /> 1. Are all of the proposed subsurface locations at least 5 feet(1.5 meters)from any identified ❑ ❑ ❑ <br /> subsurface utility? <br /> 2. Are all of the proposed subsurface locations at least 7 feet(2.1 meters)from the pad ❑ ❑ ❑ <br /> surrounding any underground storage tanks (USTs)shown on the Site Plan? <br /> 3. Are all of the proposed subsurface locations at least 5 feet(1.5 meters)from any subsurface ❑ ❑ ❑ <br /> utilities shown on the Public Right-of-Way street improvements? <br /> "These set back distances are a minimum;government regulations and utility requirements may dictate a greater set back distance. <br /> VI. Utility Clearance Investigation Location Confirmation* <br /> 1. Have the hand clearance/tolerance zones of subsurface locations been observed and <br /> utilities exposed through the use of non-destructive techniques as follows? Hand/non- <br /> destructive technique clearance should be extended if locations of deep utilities and ❑ ❑ ❑ <br /> structures are not known. In non-urban areas hand clearing should be conducted if possible <br /> and according to local requirements. <br /> a. For soil borings/monitoring wells; excavated to a minimum of 5 feet(1.5 meters)below ❑ ❑ ❑ <br /> ground surface using non-mechanical methods? <br /> b. For soil gas sampling; excavated to 2 foot(0.6 meter) below grade or below the bottom ❑ ❑ ❑ <br /> of a concrete floor prior to the installation of soil gas sample probe points? <br /> Exceptions to requirements of the utility clearance process, as permitted by the applicable jurisdiction, include the following: <br /> • Sites where extensive utility mapping(e.g.geophysical survey)has been completed and/or where extensive activities <br /> have already been performed. <br /> • Locations where facility layout is well documented and understood. <br /> • Sites or portions of large sites where utilities are known not to exist currently or to not have ever existed throughout the <br /> life of the facility,property or site. <br /> Underground Utilities&Subsurface Installations Clearance Checklist(S3AM-331-FM1) <br /> Revision 1 September 30,2020 <br /> PRINTED COPIES ARE UNCONTROLLED. CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. Page 2 of 4 <br />