Laserfiche WebLink
A=COM <br /> Part 1 and Part 2 shall be completed prior to any intrusive subsurface work. DO NOT DISTURB GROUND if a "No"or <br /> "N/A"answer to any of the Part 1 questions has not been initialed as authorized by the AECOM Manager. <br /> Any variance from these procedures requires approval of the Vice President of the applicable business group. <br /> Yes No I N/A <br /> Comments: <br /> Documentation supplied by one-call or private utility and installation locators, including email or written <br /> field confirmation/maps of mark-out requests and status shall accompany this form. If this form is <br /> supporting multiple ground disturbance activities,a copy of this completed form should be provided to each <br /> activity, <br /> Part 2 <br /> Public Utility Locate(OneCall) Prior Locate Ticket# <br /> Date Called: Called By: Valid Until: <br /> Ticket Number: Area Requested To Be Cleared: <br /> Private Utility Locate Prior Locate Ticket# <br /> Company Performing Locate: Date Completed: <br /> Area(s)Requested To Be Cleared <br /> (including distance around marked locations): <br /> Method(s)Used (e.g., GPR, EM): <br /> Confirm Area(s)Cleared: <br /> OneCall Utilities Field Observation <br /> Utility Notified by Comments Marked(mains&services) <br /> Electric_ ❑ OneCall ❑ Other ❑Yes ❑ No ❑Above <br /> Gas/Petroleum Pipeline (Yellow) ❑ OneCall ❑ Other ❑Yes ❑ No <br /> Sewer/Drainage ❑ OneCall ❑ Other ❑Yes ❑ No <br /> Water= ❑ OneCall ❑ Other ❑Yes ❑ No <br /> Communications(Orange) ❑ OneCall ❑ Other ❑Yes ❑ No ❑Above <br /> Other ❑ OneCall ❑ Other ❑Yes ❑ No ❑Above <br /> Were all circuits on during subsurface checks if the checks were for identifying energized lines ❑Yes ❑ No ❑ N/A <br /> (e.g., circuits on timers or light sensing switches)? <br /> Utilities Not Identified By OneCall Field Observation <br /> Includes both Public and Private along with Regional and Site Utilities <br /> Utility Colors may vary) Owner/Contact/Phone# Notified Marked <br /> Communications: (Orange)TV, computer, <br /> phone, cell towers, site communication, ❑Yes❑No ❑ Yes ❑ No ❑Above <br /> cameras, security, etc. <br /> Electricity:=Mains/Supplies/Interior <br /> /Exterior(signs, fuel pumps, low voltage <br /> security perimeters, gates, property light ❑Yes❑No El Yes El No El Above <br /> posts, equipment, substations,etc. <br /> Gas: (Yellow)Mains/Supplies/Equipment/ <br /> Pipelines (Natural, Process, Oil, Crude, ❑Yes❑No ❑Yes ❑ No ❑Above <br /> Refined Gas, Diesel,Jet), etc. <br /> Steam: (Yellow) ❑Yes[:]No ❑Yes ❑ No ❑Above <br /> Underground Utilities&Subsurface Installations Clearance Checklist(S3AM-331-FM1) <br /> Revision 1 September 30,2020 <br /> PRINTED COPIES ARE UNCONTROLLED. CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. Page 3 of 4 <br />