My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
600
>
2900 - Site Mitigation Program
>
PR0548753
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2026 11:33:41 AM
Creation date
3/2/2026 11:15:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548753
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027916
FACILITY_NAME
BOBSON CLEANERS, INC.
STREET_NUMBER
600
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22314117
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
600 N MAIN ST MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
558
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AECOM <br /> SOP 202 - COC and Quality Sample Procedures <br /> 1 SUMMARY: <br /> This procedure outlines standards when completing and handling chain-of-custody <br /> documentation for any type of analytical samples taken and submitted to the lab. <br /> Quality sample standards are also outlined in this procedure. <br /> 2 PROCEDURE: <br /> 2.1 CHAIN-OF-CUSTODY (COC) <br /> • Required analyses should be determined before field work is commenced. <br /> • Sections that are usually prefilled before fieldwork begins include: <br /> o Lab client <br /> o Client project name/number <br /> o P.O. number <br /> o Address and telephone numbers <br /> o Project contact <br /> o Email addresses <br /> o Turnaround time (usually standard turnaround time) <br /> • COC fields that should be filled in, if not prefilled, as soon as possible after samples <br /> are collected include: <br /> o Page numbers <br /> o Sampler signature <br /> o Date <br /> o Sample Identification <br /> o Location/Description <br /> o Sample date <br /> o Sample time <br /> o Matrix (water, soil, soil gas, etc.) <br /> o Number of containers <br /> • Check requested analyses if not prefilled. If prefilled, double-check that the analyses <br /> checked match the bottle set instructed to take. If prefilled analyses do not match the <br /> bottle set consult with the Sampling and Analysis Plan and report discrepancy to project <br /> manager. <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.