My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
600
>
2900 - Site Mitigation Program
>
PR0548753
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2026 11:33:41 AM
Creation date
3/2/2026 11:15:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548753
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027916
FACILITY_NAME
BOBSON CLEANERS, INC.
STREET_NUMBER
600
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22314117
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
600 N MAIN ST MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
558
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ACOM <br /> SOP 404 - Grab Groundwater Sampling <br /> (Procedure Not Applicable to PFAS) <br /> 1 SUMMARY: <br /> Soil vapor wells will be installed, and grab groundwater samples will be collected when <br /> groundwater is present. Soil vapor wells will be drilled to the targeted maximum depth; <br /> however, should groundwater be encountered at a depth less than 16 feet below ground <br /> surface (bgs), a grab groundwater sample will be collected. Sampling equipment may <br /> include bailers (either metal or plastic), , PVC casings and screens, sample containers, and <br /> decontaminations supplies (three 5-gallon buckets, Liquinox®and deionized [DI] water). <br /> Procedure: <br /> • The uppermost section of the shallowest water encountered will be subject to <br /> groundwater sampling. <br /> • Groundwater samples will be collected with a Hydropunch groundwater sampler or <br /> disposable bailer following the installation of a temporary PVC casing. <br /> Using direct-push technology, advance boreholes to depth. If boring extends into <br /> groundwater, proceed to groundwater sample collection. <br /> • Advance a small diameter hollow push rod with a closed configuration filter tip to <br /> groundwater collection depth. <br /> • Once at depth, retract the push rods and expose filter screen to allow groundwater to <br /> infiltrate the inlet screen. <br /> • Lower a disposable bailer through the push rod to the screened section and retrieve <br /> grab groundwater sample. <br /> • Transfer groundwater from bailer into the appropriate sampling containers supplied by <br /> the laboratory. <br /> o Pick-up sample bottle and remove cap. <br /> o Fill sample container per project specified directions. <br /> o Place cap on sample bottle and screw tight. <br /> o Label sample bottle as directed by project instructions. <br /> o Apply tape and a tamper proof seal to lid of container and initial the seal. <br /> o Repeat steps c through e until all sample containers are filled. <br /> o Place filled sample containers in appropriate size re-sealable bags. <br /> o Place bags with filled sample containers inside cooler containing ice. <br /> o All samples should be shipped within 24 hours to minimize delay in analysis. <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.