My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
600
>
2900 - Site Mitigation Program
>
PR0548753
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2026 11:33:41 AM
Creation date
3/2/2026 11:15:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548753
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027916
FACILITY_NAME
BOBSON CLEANERS, INC.
STREET_NUMBER
600
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22314117
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
600 N MAIN ST MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
558
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Universal Health & Safety Plan IF, <br /> For use on all high-risk,industrial and HAZWOPER projects <br /> Department of Toxic Substances Control <br /> 9.2 Safety for Life...................................................................................................................25 <br /> 9.3 Life Preserving Principles.................................................................................................25 <br /> 9.4 Fitness for Duty................................................................................................................25 <br /> 9.5 Proactive Health ..............................................................................................................26 <br /> 9.6 Fatigue.............................................................................................................................26 <br /> 9.7 Driving and Vehicle Safety...............................................................................................26 <br /> 9.8 Fatigue and Driving Safety...............................................................................................27 <br /> 9.9 Hand Safety.....................................................................................................................28 <br /> 9.10 Substance Abuse.............................................................................................................28 <br /> 9.11 Rewards and Recognition................................................................................................28 <br /> 9.12 Stop Work Authority.........................................................................................................29 <br /> 10. Roles and Responsibilities.........................................................................30 <br /> 10.1 AECOM Project Manager.................................................................................................30 <br /> 10.2 AECOM Site Supervisor ..................................................................................................30 <br /> 10.3 AECOM Site Safety Officer..............................................................................................31 <br /> 10.4 AECOM SH&E Manager..................................................................................................31 <br /> 10.5 AECOM Employees.........................................................................................................32 <br /> 10.6 Visitors.............................................................................................................................32 <br /> 11. Subcontractor Management.......................................................................33 <br /> 11.1 AECOM Roles/Responsibilities for Sub Management......................................................33 <br /> 11.2 Subcontractor Roles/Responsibilities for Safety...............................................................33 <br /> 11.3 Subcontractor HASP/THAs..............................................................................................33 <br /> 12. Training and Documentation......................................................................34 <br /> 12.1 HASP/Site Safety Orientation ..........................................................................................34 <br /> 12.2 Worker Training and Qualifications ..................................................................................34 <br /> 12.3 Competent Person(s).......................................................................................................34 <br /> 13. Hazard Assessment and Control...............................................................35 <br /> 13.1 SH&E Procedures............................................................................................................35 <br /> 13.2 Task Hazard Assessments and Daily Tailgate Meetings..................................................35 <br /> 13.3 Hazard Categories...........................................................................................................36 <br /> 13.4 4-Sight.............................................................................................................................37 <br /> 13.5 Speak Up/Listen Up.........................................................................................................37 <br /> 14. Incident Reporting.......................................................................................38 <br /> 14.1 Incident Notifications and Reporting.................................................................................38 <br /> 14.1.1 AECOM Internal Notifications ..........................................................................................38 <br /> 14.1.2 Client Specific Notifications..............................................................................................38 <br /> 14.1.3 Incident Investigation.......................................................................................................38 <br /> 14.2 Incident and Near Miss Reporting....................................................................................39 <br /> 14.2.1 Motor Vehicle Incidents ...................................................................................................40 <br /> 14.2.2 Safety Observation Reporting..........................................................................................40 <br /> 14.2.3 SH&E Database Access..................................................................................................40 <br /> 14.2.4 Reporting Assistance.......................................................................................................40 <br /> ©AECOM Restricted <br /> Universal Heath and Safety Plan Template(S4(DSC)AM-209-FM-C) <br /> Revision 12 September 9,2021 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. <br />
The URL can be used to link to this page
Your browser does not support the video tag.