Laserfiche WebLink
Universal Health & Safety Plan <br /> For use on all high-risk,industrial and HAZWOPER projects <br /> Department of Toxic Substances Control <br /> 15. Environmental Management ......................................................................41 <br /> 15.1 Scope ..............................................................................................................................41 <br /> 15.2 Roles and Responsibilities...............................................................................................41 <br /> 15.3 Staffing and Awareness...................................................................................................41 <br /> 15.4 Pollution Prevention.........................................................................................................41 <br /> 15.5 Waste Management.........................................................................................................41 <br /> 16. AECOM Audits and Inspections ................................................................43 <br /> 16.1 Project Manager Self Assessments .................................................................................43 <br /> 16.2 Senior Management Activities (SMAs).............................................................................43 <br /> 16.3 Project Safety Reviews (PSRs)........................................................................................43 <br /> 16.4 Site Safety Inspections (OSHA Type) ..............................................................................43 <br /> 16.5 External Regulatory Inspections.......................................................................................43 <br /> 17. Project Closeout ..........................................................................................44 <br /> 17.1 Health and Safety File......................................................................................................44 <br /> 18. Personal Acknowledgement ......................................................................45 <br /> 18.1 Disclaimer........................................................................................................................45 <br /> Attachments <br /> Attachment A: Hospital/Clinic Maps <br /> Attachment B: Incident Reporting Flow Chart <br /> Attachment C: THA Forms, and Tailgate Safety Meeting Form <br /> Attachment D: Applicable AECOM SHE Procedures <br /> Attachment E: Stretch/Flex Poster <br /> Attachment F: Site Safety Orientation <br /> Attachment G: Safety Data Sheets <br /> Attachment H: Work Plan/Client SH&E Requirements <br /> Attachment I: Project Emergency Response Plan <br /> Attachment J: Project Hazardous Materials Communication Plan <br /> Attachment K: AECOM SH&E Policy <br /> Attachment L: Competent Person Designation <br /> Attachment M: AECOM Coronavirus Guidance and COVID-19 Vaccine Policy <br /> Attachment N: Heat Illness Prevention Plan <br /> Attachment O: Respiratory Protection From Wildfire Smoke <br /> ©AECOM Restricted <br /> Universal Heath and Safety Plan Template(S4(DSC)AM-209-FM-C) <br /> Revision 12 September 9,2021 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. <br />