Laserfiche WebLink
Universal Health & Safety Plan <br /> For use on all high-risk,industrial and HAZWOPER projects <br /> Department of Toxic Substances Control <br /> Monitoring Procedures and Action Levels <br /> Parameter Zone Location and Action Level Response Activity <br /> Monitoring Interval <br /> >5 ppm ■ Cease work,exit the area or confined <br /> space,and contact the Site Safety Officer, <br /> Site Supervisor and Project Manager. <br /> ❑X Combustible Gas Breathing zone or in the immediate >5%of LEL ■ Cease work, exit, and contact the Site <br /> (multi-gas meter or work area continuously during Safety Officer, Site Supervisor, and <br /> individual combustible tasks where explosive Project Manager. <br /> gas indicator, CGI) atmospheres are possible <br /> ❑X Oxygen(02) Breathing zone, continuously < 19.5%02 ■ Cease work deficient atmosphere), exit <br /> (multi-gas detector or during tasks were oxygen enriched the area or confined space, and contact <br /> individual 02 meter) or deficient atmospheres are the Site Safety Officer, Site Supervisor, <br /> possible and Project Manager. <br /> >23.5%02 ■ Cease work enriched atmosphere), exit <br /> the area or confined space, and contact <br /> the Site Safety Officer, Site Supervisor, <br /> and Project Manager. <br /> ❑X Carbon Monoxide(CO) Breathing zone, continuously < 10 ppm ■ Continue work in Level D and continue <br /> (multi-gas detector or during tasks where exposure to monitoring <br /> individual CO meter) CO is possible > 10 ppm ■ Cease work,exit the area or confined <br /> space,and contact the Site Safety Officer, <br /> Site Supervisor, and Project Manager. <br /> ❑ Dust not otherwise Breathing zone every 30 minutes <5 mg/m3 ■ Continue work in Level D and continue <br /> classified during field activities where monitoring <br /> (total by aerosol monitor) exposure to excessive dusts are >5 mg/m3 ■ Upgrade to Level C(P100 respirator <br /> possible cartridges), implement dust suppression <br /> measures; contact the Site Safety <br /> Officer&Site Supervisor. <br /> > 10 mg/m3 ■ Cease activities, implement more <br /> effective dust suppression measures; <br /> contact the Site Safety Officer&Site <br /> Supervisor. <br /> ❑ Dust not otherwise Edge of Exclusion Zone, every 30 <5 mg/m3 ■ Continue work in required PPE, monitor <br /> classified minutes during excavation air, and implement engineering controls <br /> (total by aerosol monitor) activities >5 mg/m3 ■ Cease activities and contact the Site <br /> Safety Officer&Site Supervisor. <br /> ❑X Noise monitoring Working zone, continuously during >85 dBA ■ Always carry hearing protection <br /> tasks where exposure to noise when working near tracks. <br /> over 85 dBA is possible ■ Hearing protection is mandatory <br /> when working in any area where <br /> noise level is such that a raised <br /> voice is necessary to have a <br /> normal conversation. <br /> ■ Exposure limits are 85 dBA for 8 <br /> hours. <br /> ❑X Other: ■ Continue monitoring <br /> Wildfire Smoke(Attachment 0) ■ Continue work in the required PPE <br /> ■ STOP WORK and exit the work area or <br /> confined space <br /> ■ Contact the Site Safety Officer, Site <br /> Supervisor, and Project Manager <br /> ©AECOM Restricted <br /> Universal Heath and Safety Plan Template(S4(DSC)AM-209-FM-C) 9 <br /> Revision 12 September 9,2021 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. <br />