My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0083102 (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1173
>
2900 - Site Mitigation Program
>
SR0083102 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2026 4:49:37 PM
Creation date
3/2/2026 4:40:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0083102
PE
2903 - WORKPLAN/REPORT PLAN CHECK - OTHER AGENCY
FACILITY_NAME
TIRE AND BRAKE PRO'S - NICK HARRIS
STREET_NUMBER
1173
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21635012
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
1173 N MAIN ST MANTECA 95336
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Limited Phase II Site Assessment Work Plan <br /> TRICO PROPERTY <br /> 1173 North Main Street, Manteca, California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION................................................................................................... 1 <br /> 2.0 SCOPE OF WORK................................................................................................ 1 <br /> 2.1. PERMITTING AND PRE-FIELD WORK ACTIVITIES ........................................ 2 <br /> 2.2. SOIL BORING AND SAMPLING........................................................................2 <br /> 2.3. SOIL AND GROUNDWATER LABORATORY ANALYSIS................................. 2 <br /> 2.4. SOIL-VAPOR SAMPLING AND SAMPLING ...................................................... 3 <br /> 2.5. REPORT PREPARATION.................................................................................. 3 <br /> 3.0. FIELD PROCEDURES..........................................................................................3 <br /> 3.1. SOIL PROBE BORING ADVANCEMENT.......................................................... 3 <br /> 3.1.1. Soil Sampling............................................................................................... 3 <br /> 3.1.2 Grab Groundwater Sampling.......................................................................4 <br /> 3.1.3 Soil-Vapor Sampling & Analysis ..................................................................4 <br /> 3.1.4. Boring Abandonment................................................................................... 6 <br /> 3.2. EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT.......................... 6 <br /> FIGURES <br /> Figure 1 — Site Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.