My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30131
>
2900 - Site Mitigation Program
>
PR0545118
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2026 12:55:53 PM
Creation date
3/3/2026 12:52:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545118
PE
2965 - RWQCB LEAD AGENCY WASTE DISCHARGE SITE
FACILITY_ID
FA0025664
FACILITY_NAME
CEMEX KERLINGER AGGREGATE PLANT
STREET_NUMBER
30131
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95337
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
30131 S MACARTHUR DR TRACY 95337
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V <br /> geology consists of recent unconsolidated alluvial and fluvial deposits typically containing sediments that <br /> are a mixture of gravels, sands, silts and clays. <br /> The site is located within the San Joaquin groundwater basin. Beneficial uses of groundwater in the area <br /> include municipal, domestic, irrigation, stock watering, process, and service supply. <br /> 2. Proposed Scope of Work <br /> GHD proposes to assess the current condition of well MW-3 through visual inspection and with the <br /> assistance of a licensed C-57 driller. GHD will notify SJCEHD of the scheduled inspection so they have <br /> the option of overseeing the inspection. <br /> If the PVC well casing is not cracked, or is only cracked near surface grade, GHD will repair the well and <br /> associated monument structure. <br /> If the well cannot be repaired, GHD will oversee the full drill-out and re-installation of MW-3. Further <br /> details for each option are described below in Section 2.4. The well location is shown on Figure 2. <br /> To complete the proposed scope of work, GHD will perform the following tasks. <br /> 2.1 Site Health and Safety Plan <br /> GHD will update the previously prepared site safety plan to inform site workers of known hazards and to <br /> provide health and safety guidance. The plan will be kept onsite at all times during field activities and <br /> signed by all site workers and visitors. <br /> 2.2 Permits <br /> GHD will obtain the necessary permits and notify San Joaquin County a minimum of 48 hours prior to <br /> beginning field operations. GHD will also ensure that the site owners have been notified of the proposed <br /> field schedule. <br /> 2.3 Underground Utility Location <br /> GHD will notify Underground Service Alert(USA)at least 72 hours prior to field activities to clear the <br /> monitoring well locations with public utility companies. <br /> 2.4 Well Repair or Well Installation <br /> GHD will oversee well repair or well destruction/installation activities by a licensed C-57 driller. As <br /> mentioned above, the stovepipe and well casing were damaged during onsite activities. The well will be <br /> inspected by removing the concrete apron, stovepipe and a portion of the grout seal to determine the <br /> extent of damage to the PVC casing. <br /> 112059W-RPT-1-Well Repair Work Plan-2019.dwx 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.