My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30131
>
2900 - Site Mitigation Program
>
PR0545118
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2026 12:55:53 PM
Creation date
3/3/2026 12:52:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545118
PE
2965 - RWQCB LEAD AGENCY WASTE DISCHARGE SITE
FACILITY_ID
FA0025664
FACILITY_NAME
CEMEX KERLINGER AGGREGATE PLANT
STREET_NUMBER
30131
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95337
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
30131 S MACARTHUR DR TRACY 95337
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PMMMR <br /> If the well can be repaired, the damaged portion of the well will be removed/cut-off and new casing with a <br /> slip coupler and neat cement will be used to repair and seal the well. The stovepipe will be re-installed <br /> and a new apron poured to secure it. <br /> If SJCEHD or GHD determines that the well MW-3 cannot be repaired, it will be over-drilled to the total <br /> depth of 150 feet below grade(fbg) using 10-inch hollow-stem augers. Following the drill-out, GHD will <br /> oversee the installation of a new well in the same boring with the same screened interval and well <br /> construction specifications as the previous well. The boring log showing well construction specifications <br /> for MW-3 is included in Attachment B. <br /> 2.5 Well Development <br /> Whether repaired or drilled out and reinstalled, MW-3 will be developed using surge block agitation and <br /> bailer or pump evacuation. A maximum of 10 casing volumes will be purged during the well development <br /> process. Water quality parameters (temperature, pH, conductivity, turbidity, and dissolved oxygen)will be <br /> taken periodically and noted on the well development log. If a new well is installed, development will be <br /> no sooner than 48 hours after placement of the sanitary seal. Water generated during well installation and <br /> development will be placed in drums, labelled and left onsite for future recycling. <br /> 2.6 Wellhead Survey and Groundwater Sampling <br /> Whether repaired or drilled out and reinstalled, the horizontal well coordinates and top of casing for well <br /> MW-3 will be surveyed by a California licensed land surveyor. Groundwater sampling will continue to be <br /> performed as outlined in previous semi-annual monitoring reports and is not included in this scope of <br /> work. <br /> 3. Reporting and Schedule <br /> Upon completion of field activities, GHD will prepare a Well Repair or Well Destruction and Installation <br /> Report that, at a minimum,will contain: <br /> • Descriptions of the well repair or well destruction and installation activities <br /> • San Joaquin County permits <br /> • Boring log <br /> • Well development details <br /> • Well survey data <br /> If the well is over-drilled and re-installed, GHD will also prepare State of California Well Completion Report <br /> and submit it to the Department of Water Resources. <br /> 11205950-RPT-1-Well Repair Work Plan-2019.d= 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.