Laserfiche WebLink
it <br /> GHD will carry out this scope of work upon receiving written approval of this work plan from the RWQCB <br /> and obtaining the necessary permits from San Joaquin County. Once approval and permits are received, <br /> we anticipate the well will be repaired or installed within 30 to 45 days of receipt. <br /> We appreciate working with you on this project. Should you have any questions on the above, please do <br /> not hesitate to contact Brian Silva at(530)387-5713 or Brian.Silva@ghd.com. <br /> Sincerely, <br /> GHD <br /> L aFp�pc <br /> �N <br /> OftEG BFRCtAY <br /> Na 6260 <br /> 7 <br /> N), 'gyro Z <br /> Brian Silva Greg Barclay, PG 6260 <br /> BJS/cw/01 <br /> Encl. <br /> Figure 1 Vicinity Map <br /> Figure 2 Site Plan <br /> Attachment A RWQCB E-mail Correspondence <br /> Attachment B Boring Log <br /> 11205950 RPT-1-Well Repair Work Plan-2019.do 4 <br />