Laserfiche WebLink
WORK PLAN FOR ADDITIONAL SITE INVESTIGATION Irerracon <br /> Vacant Property Tracy, California <br /> April 16, 2021 ■ Terracon Project No. NA197074B <br /> 3.0 SCHEDULE <br /> Terracon anticipates the preliminary schedule for this additional site investigation and reporting as <br /> follows: <br /> MonthNear <br /> Activity 4/21 5/21 6/21 7/21 8/21 9/21 <br /> CRWQCB Work Plan Review <br /> Permitting and Field Work <br /> Report/LTCP Petition <br /> CRWQCB Report/LTCP Petition Review <br /> The scope of services and schedule is based on the assumptions that no additional soil borings <br /> are required; however, Terracon understands that the CRWQCB-CVR and SJCEHD will work <br /> cooperatively with Terracon in the event that field adjustments are required. These adjustments <br /> may include additional soil boring, permits, and mobilizations. Should such adjustments to the <br /> sampling and analytical program be necessary, this schedule may be subject to change. <br /> We appreciate the opportunity to provide this Work Plan and look forward to working with you on <br /> this project. Any questions or comments regarding this letter Work Plan can be directed to Tony <br /> Mikacich at (209) 294-7027. <br /> Sincerely, <br /> I Terracon <br /> 14,F <br /> Tony Niikacich Scott E. Gable, PG 7820 <br /> Environmental Department Manager Professional Geologist <br /> Attachments Exhibit 1 —Topographic Map <br /> Exhibit 2— Site Diagram <br /> Exhibit 3— Site Detail <br /> Responsive■ Resourceful ■ Reliable 8 <br />