My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
620
>
2300 - Underground Storage Tank Program
>
PR0231058
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2026 8:58:33 PM
Creation date
3/9/2026 9:42:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231058
PE
2361 - UST FACILITY
FACILITY_ID
FA0003738
FACILITY_NAME
CHARTER WAY SHELL*
STREET_NUMBER
620
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16504007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
620 W DR MARTIN LUTHER KING JR BLVD Stockton 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacu u m ❑ Hydrostatic <br /> Test Equipment Used: <br /> ❑ Check this box if Appendix 8.1 continuation page is attached. <br /> Tank ID 1-Super 91 2-Regular87 3-Diesel <br /> Tank Manufacturer O C Tank O C Tank O C Tank <br /> Test Start Time *NA Exempt *NA Exempt *NA Exempt <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by X Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type x Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br /> ❑ Check this box if Appendix 8.2 continuation page is attached. <br /> Pipe Run ID 1-Su per 91 2-Regular 87 3-Diesel <br /> Pipe Manufacturer Smith Smith Smith <br /> Test Start Time 1:25 1 :20 1:30 <br /> Initial Reading 3 Psi 3 Psi 3 Psi <br /> Test End Time 2:25 2:20 2:30 <br /> Final Reading 3 Psi 3 Psi 3 Psi <br /> Change in Reading 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Criteria No Loss No Loss No Loss <br /> Tightness Test Results P a s s P a s s P a s s <br /> Continuity Test Results P a s s P a s s P a s s <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results <br /> Continuity Test Results <br /> Describe in Section 9 all tests marked "Fail"and any repairs made during the test. Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.