Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. CONTAINMENT SUMP AND UDC TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard x Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacu u m X Hydrostatic <br /> Test Equipment Used: Caldwell Level Change Indicator <br /> X Check this box if Appendix 8.3 continuation page is attached. <br /> Sump/UDC ID 1-91-PS 2-87-PS 3-Diesel-PS <br /> Sump Manufacturer Western Western Western <br /> Fiberglass Fiberglass Fiberglass <br /> Sump Depth (inches) <br /> 63" 62" 62" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 15" 15" 15" <br /> inches <br /> Test Start Time 1.45 1 :42 2.27 <br /> Initial Reading .001 .001 .001 <br /> Test End Time 2:15 2:12 2:57 <br /> Final Reading .001 .001 .001 <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria > .002 ➢ .002 .002 <br /> Tightness Test Results Pass Pass Pass <br /> Continuity Test Results N A N A N A <br /> Sump/UDC ID UDC 1&2 UDC 3&4 UDC 5&6 UDC 7&8 <br /> Sump Manufacturer Bravo Bravo Bravo Bravo <br /> Sump Depth (inches) <br /> 8" 8" 8" 8" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration BP BP BP BP <br /> (inches) <br /> Test Start Time 2:32 2:37 2:42 2:47 <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 3:02 3:07 3:12 3:17 <br /> Final Reading .001 .001 .001 .001 <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria > .002 ➢ .002 ➢ .002 ➢ .002 <br /> Tightness Test ResuIts Pass Pass Pass Pass <br /> Continuity Test Results N A N A N A N A <br /> Describe in Section 9 all tests marked "Fail"and any repairs made during the test. Page 3 of 4 <br />