My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
1
>
1319 & 1327 S MADISON
>
0
>
2900 - Site Mitigation Program
>
PR0546597
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 10:12:07 AM
Creation date
3/12/2026 9:59:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0546597
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0026437
FACILITY_NAME
ESTATE OF ANDREW J MAGNASCO SR
STREET_NUMBER
0
STREET_NAME
1319 & 1327 S MADISON
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14708413
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
1319 & 1327 S MADISON ST STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Health and Safety Plan <br /> 1319 & 1327 South Madison Street, Stockton, CA <br /> 432770 <br /> headlamps as appropriate for the activity being conducted. Personal security will be assessed <br /> and measures taken as discussed above if appropriate. <br /> B15: Severe Weather <br /> Severe weather conditions include high winds, electrical storms, and heavy rain. At a minimum, <br /> all work outdoors will cease during these events. When lightning is spotted, site personnel <br /> should use the following steps to avoid injury: <br /> • Workers should note the flash-boom ratio (i.e., count the seconds after the lightning was seen <br /> until the thunder was heard). <br /> • By counting the seconds between seeing lightning and hearing thunder and dividing by 5, you <br /> can estimate your distance from the storm (in miles). If the storm is 6 miles away or less (30 <br /> seconds between when lightning was seen and thunder was heard) workers must stop work <br /> and take shelter. <br /> • If the storm is more than 6 miles away (greater than 30 seconds between lightning and <br /> thunder), the site supervisor should monitor the storm and be prepared to cease work if the <br /> storm approaches an unsafe distance. Since storms can travel at varying speeds and the <br /> amount of time at takes to cease and secure operations will also vary, so prudent judgment <br /> should be exercised when storms are in the vicinity and/or developing (e.g., darkening skies, <br /> increasing wind speeds, etc.). <br /> • Workers should not stay in exposed areas (outdoors on the ground, on a roof, in an aerial lift, <br /> on a steel truss, on an ungrounded steel structure, in a golf cart, un-sided building, etc.) after <br /> lightning has been witnessed. All personnel must move to a safe location. <br /> • Workers should wait 30 minutes from the last sight of lightning or sound of thunder before <br /> returning to work. <br /> • Those required to travel from one building to another during the 30 minute wait time should <br /> do so only by enclosed vehicle. <br /> • Once the 30 minute wait time period has elapsed and no additional lightning or thunder has <br /> been seen or heard, individuals may resume normal work. <br /> B16: Aboveground and Underground Utilities - Various forms of underground and <br /> aboveground utility lines or pipes (carrying water, wastewater, gas, and or electricity) may be <br /> encountered during work activities. Prior to the start of intrusive activities, all utilities must be <br /> located and measurements must be instituted to avoid contact with these structures in <br /> accordance with the procedures outlined in the site-specific HASP. All utility lines and piping will <br /> be identified and rendered controlled (though lockout/tagout procedures) or protected from <br /> damage. Work involving machinery with high extensions (backhoes, etc.) will remain at least 6 <br /> feet (2.1 meters) from overhead power lines. <br /> B17: Trenching/Excavation - An excavation is any manmade cut, cavity, trench, or <br /> depression in an earth surface, formed by earth removal. A trench is narrow excavation (in <br /> relation to its length) made below the surface of the ground. The following safe operating <br /> guidelines apply to open trenches or excavations exceeding four (4) feet in depth or of any <br /> depth if in unstable soil conditions. <br /> • Excavated materials will be stored and retained at least 2 feet from the edge of the excavation. <br /> This procedure must be observed even when excavation/trench entry will not occur. <br />
The URL can be used to link to this page
Your browser does not support the video tag.