Laserfiche WebLink
OPTIONAL PRIMER <br />APPLICATION - OPTIONAL PRIMER - RESUFLOR MPE <br />1ST BROADCAST COAT <br />sherwin-williams.com/resin-flooringDESIGNED TO PERFORM <br />APPLICATION - 1ST BROADCAST COAT - RESUFLOR MPE <br />COVERAGE RATE: One gallon of RESUFLOR MPE will cover <br />160 sq. ft. at 10 mils wet/dry film <br />145 sq. ft. at 11 mils wet/dry film <br />133 sq ft. at 12 mils wet/dry film <br />80°F <br />20 min <br />80°F <br />20 min <br />COVERAGE RATE: One gallon of Resuflor MPE will cover: <br />160 sq. ft. at 10 mils wet/dry film <br />145 sq. ft. at 11 mils wet/dry film <br />133 sq. ft. at 12 mils wet/dry film <br />PREMIX PART A using a Jiffy’ mixer blade and slow speed drill <br />(This is required for both 3-gallon and full-filled 5-gallon units.) <br />For full-filled 5 gallon pails, pour out 2 gallons into a measuring <br />container. Then, pour the measured Part A into a mixing pail. <br />ADD RESUFLOR MPE PART B TO PART A (3 GALLONS <br />TOTAL MIX) For full-filled 5-gallon pails, pour out 1 gallon Part B <br />into a measuring container that is separate from the one used <br />with the Part A. Then, add the measured Part B to the Part A <br />already in the mixing pail. POTLIFE: Mix only enough material <br />which can be applied within the work time (time between the <br />addition of Part B to Part A and the completion of all application <br />actions). Check the following chart for work times at various <br />temperatures. For smaller quantities, use 2 parts PART A to 1 <br />part PART B by volume. <br />90°F <br />15 min <br />APPLICATION - 1ST BROADCAST COAT - QUARTZ AGGREGATE <br />IMMEDIATELY BROADCAST TO EXCESS WITH DECORATIVE <br />QUARTZ into the uncured Resuflor MPE resin on the floor. Do <br />not dump or pile the material Gently scatter it onto the floor by <br />hand tossing so as to cover the wet resin completely. NOTE: It is <br />important that epoxy is not visible (no wet or shiny areas) after <br />quartz settles because any visible epoxy will yellow. A coverage <br />rate of 0.4 to 0.5 pounds per sq. ft of quartz is recommended <br />ALLOW SYSTEM TO CURE 8-10 hours at 75°F. <br />THOROUGHLY SWEEP AND VACUUM to remove loose colored <br />quartz from surface. NOTE: DO NOT save and reuse swept and <br />vacuumed colored quartz unless you have taken <br />extra precautions. <br />PREMIX PART A using a Jiffy’ mixer blade and slow speed drill. <br />(This is required for both 3-gallon and full-filled 5-gallon units.) <br />For full-filled 5 gallon pails, pour out 2 gallons into a measuring <br />container. Then, pour the measured Part A into a mixing pail. <br />ADD RESUFLOR MPE PART B TO PART A (3 GALLONS <br />TOTAL MIX). For full-filled 5-gallon pails, pour out 1 gallon Part <br />B into a measuring container that is separate from the one used <br />with the Part A. Then, add the measured Part B to the Part A <br />already in the mixing pail POTLIFE: Mix only enough material <br />which can be applied within the work time (time between the <br />addition of Part B to Part A and the completion of all application <br />actions). Check the following chart for work times at various <br />temperatures. For smaller quantities, use 2 parts PART A to 1 <br />part PART B by volume. <br />RESUFLOR DECO QUARTZ DB23 <br />SYSTEM GUIDE <br />90°F <br />15 min <br />Sherwin-Williams, <br />MIX FOR 3 MINUTES using a Jiffy’ mixer blade and slow speed <br />drill (Failure to do so could result in lower/dimmished <br />coating properties.) <br />IMMEDIATELY POUR ALL OF THE MIXED MATERIAL onto the <br />floor in a single bead <br />PUSH THE SQUEEGEE at an even speed using downward <br />pressure to apply the desired thickness. A notched squeegee <br />can be used to increase the thickness applied NOTE: The use of <br />spiked shoes will allow freedom of movement on the wet floor <br />CAUTION: The surface will be slippery. <br />START THE SECOND AND REMAINING PASSES by pushing <br />material parallel to the first stroke. Hold the bead of material <br />near the center of the bar and push at an even speed with slight <br />down pressure. <br />BACKROLL THE MATERIAL with a 3/8" nap roller for a smooth <br />uniformed appearance. Backrollmg is required to remove the <br />puddles and squeegee lap marks in order to obtain uniform <br />texture and a consistent mil thickness. <br />MIX FOR 3 MINUTES using a Jiffy' mixer blade and slow speed <br />drill. (Failure to do so could result in lower/diminished <br />coating properties.) <br />IMMEDIATELY POUR ALL OF THE MIXED MATERIAL onto the <br />floor in a single bead <br />PUSH THE SQUEEGEE at an even speed and down pressure to <br />apply the desired thickness A notched squeegee can be used to <br />increase the thickness applied NOTE: The use of spiked shoes <br />will allow freedom of movement on the wet floor CAUTION: The <br />surface will be slippery. <br />START THE SECOND AND REMAINING PASSES by pushing <br />material parallel to the first stroke. Hold the bead of material <br />near the center of the bar and push at an even speed with slight <br />down pressure. <br />BACKROLL THE MATERIAL with a 3/8" nap roller for a smooth <br />uniformed appearance. Backrollmg is required to remove the <br />puddles and squeegee lap marks in order to obtain uniform <br />texture and a consistent mil thickness. <br />APPROXIMATE WORK TIME <br />65°F 70°F 75°F <br />40 min 30 min 25 min <br />APPROXIMATE WORK TIME <br />65°F 70°F 75°F <br />40 min 30 min 25 min