Laserfiche WebLink
2ND BROADCAST COAT <br />TOPCOATAPPLICATION - 2ND BROADCAST COAT - RESUFLOR MPE <br />APPLICATION - TOPCOAT- RESUTILE HTS 100 <br />APPLICATION - DECORATIVE QUARTZ <br />REPEAT STEPS used for application of the broadcast quartz <br />GROUT COAT <br />APPLICATION - GROUT COAT - RESUFLOR UVE <br />sherwin-williams.com/resin-flooringDESIGNED TO PERFORM <br />COVERAGE RATE: One gallon of Resuflor MPE will cover 65-70 <br />sq ft./gal at 22-24 mils wet/dry film. <br />REPEAT STEPS used for mixing and spreading of the first <br />seed coat. <br />75°F <br />35 mm <br />80°F <br />30 min <br />NOTE: The topcoat of Resutile HTS 100 must be applied after <br />the Resuflor UVE has set up enough to walk on and <br />within 24 hours. <br />COVERAGE RATE: A gallon of Resuflor UVE will cover 107 sq. ft. <br />at 15 mils wet/dry film 100 sq. ft. at 16 mils wet/dry film. <br />PREMIX PART A using a Jiffy- mixer blade and slow speed drill <br />Pour out 2 gallons into a measuring container. Then, pour the <br />measured Part A into a mixing pail. <br />ADD RESUFLOR UVE PART B TO PART A (3 GALLONS TOTAL <br />MIX) Pour out 1 gallon Part B into a measuring container that <br />is separate from the one used with the Part A. Then, add the <br />measured Part B to the Part A already in the mixing pail. <br />POTLIFE: Mix only enough material which can be applied within <br />the work time (time betv/een the addition of Part B to Part <br />A and the completion of all application actions). Check the <br />following chart for work times at various temperatures <br />For smaller quantities, use 2 parts PART A to 1 part PART B <br />by volume. <br />APPROXIMATE WORK TIME <br />65°F 70°F <br />50 min 40 min <br />90°F <br />25 min <br />SPREAD THE MATERIAL evenly with V-shaped cross passes <br />MAKE SURE THE FLOOR HAS JUST ENOUGH COATING TO <br />COVER EVENLY. Excess material could cause the floor to blister, <br />especially in high humidity. Insufficient material will cause the <br />floor to look non-uniform. <br />LEVEL THE AREA with straight passes that cross the initial <br />material paths. These final strokes will reduce roller marks. If the <br />appearance is not satisfactory, reroll the area. <br />REMIX THE MATERIAL in the tray occasionally (with the roller) <br />to prevent settling of the Part C (filler). <br />NOTE: When multiple applicators are used to apply material, <br />inconsistencies between areas may result. To ensure a more <br />uniform finish, an individual outfitted with spike shoes may finish <br />by pushing or pulling a roller across all applicator areas <br />ALLOW COATING TO DRY 24 HOURS at 75°F, 50% relative <br />humidity before opening to light traffic. Allow more time at low <br />temperatures, low humidity or for heavier traffic. Full coating <br />properties take 14 days to develop. <br />POUR PART C INTO PART A while mixing <br />CONTINUE TO MIX AND ADD PART B <br />RESUFLOR DECO QUARTZ DB23 <br />SYSTEM GUIDE <br />MIX FOR 3 MINUTES using a Jiffy' mixer blade and slow speed <br />drill Pour into application tray. <br />APPLY RESUTILE HTS 100 at the rate of 535 sq.ft./gal with <br />a 3/8" nap roller. For proper appearance and development <br />of physical properties, it is crucial that material is not applied <br />above or below this rate. Dip the roller in the coating and lightly <br />roll out excess in the application tray. Apply two 8-10-ft.-long <br />paths on the concrete, making one stroke left to right and one <br />right to left. Rewet the roller and apply two more paths adjacent <br />to the first pair. Rewet roller and apply a third pair adjacent to <br />the second. <br />PREMIX PART A FOR 3 MINUTES USING A JIFFY' MIXER <br />BLADE with slow speed drill. POTLIFE: Mix only enough material <br />which can be used in a two-hour period. NOTE: Once opened, <br />this material cannot be resealed for later use. <br />Sherwin-Williams. <br />MIX FOR 2 MINUTES using a Jiffy' mixer blade and slow speed <br />drill. (Failure to do so could result in lower/dimmished <br />coating properties.) <br />IMMEDIATELY POUR ALL OF THE MIXED MATERIAL onto the <br />floor in a single bead <br />PUSH THE FLAT SQUEEGEE at an even speeo with sufficient <br />down pressure to apply the thinnest coat NOTE: The use of <br />spiked shoes will allow freedom of movement on the wet floor. <br />START THE SECOND AND REMAINING PASSES by pushing <br />material parallel to the first stroke Hold the bead of material <br />near the center of the bar. <br />BACKROLL THE MATERIAL with a 3/8" nap roller for a smooth <br />uniformed appearance. Backrolhng is required to remove the <br />puddles and squeegee lap marks in order to obtain uniform <br />texture and a consistent mil thickness. NOTE: Get off the <br />Resuflor UVE as soon as possible. <br />Resuflor UVE must be topcoated with Resutile HTS 100 at floor <br />temperatures of 65-90°F within 24 hours.