My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILCOX
>
2478
>
2900 - Site Mitigation Program
>
PR0548208
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 2:45:08 PM
Creation date
3/12/2026 2:37:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548208
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0027506
FACILITY_NAME
STOCKTON PROPELLER INC.
STREET_NUMBER
2478
Direction
N
STREET_NAME
WILCOX
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10102174
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2478 N WILCOX RD STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sampling Plan - 9 - 25 March 2022 <br /> Stockton Propeller, Inc. <br /> 2478 Wilcox Road, Stockton <br /> COMMENT 16 <br /> Issue: The SAP neglects to state how the results of the investigation will be reported. <br /> Requested Action: Revise the SAP to state the results of the investigation will be <br /> documented in a formal report (i.e., a SI Report) to be submitted to Central Valley Water <br /> Board staff for review. The SI Report should include the results of all samples collected <br /> at the Site to date, including the septic tanks samples collected in December 2021, and <br /> recommendations for additional work if applicable. <br /> COMMENT 17 <br /> Requested Action: Please notify Central Valley Water Board staff a minimum of five (5) <br /> working days prior to all field activities, including sampling and pumping of the septic <br /> tank, so that a Site visit can be arranged. Notification more than five (5) working days in <br /> advance would also be appreciated if possible. <br /> CONCLUSION <br /> Central Valley Water Board staff require a response to the above comments and <br /> issuance of a revised SAP that incorporates changes in response to the comments <br /> above. Please submit a revised SAP to Central Valley Water Board within 30 days of <br /> receiving this letter. If you have any questions or comments regarding this letter, please <br /> contact Amber Ginorio at (916) 464-4670 or by email at <br /> Amber.Ginorio(a-waterboards.ca.gov. <br /> AMBER L. GINORIO, G.I.T. <br /> Engineering Geologist <br /> Site Cleanup Program <br /> Federal Cleanup Unit <br /> NAI <br /> T'OWN .MU <br /> Q�pgpy`O�a� <br /> JOHN T. MURPHY, P.G., CHG 9524 <br /> Senior Engineering Geologist <br /> Unit Chief— Site Cleanup Program <br /> Federal Cleanup Unit cr- <br /> oF <br />
The URL can be used to link to this page
Your browser does not support the video tag.